Watched from above.
Epoch AI's dated notes on this site, from satellite images, permits and company statements, with the power it estimates at each step. Steps after today are its projection.
- Epoch AI's projection
Building 2 operational. Based on the completion date to "build-out an office and data hall", stated in a regulatory filing.
672 MW for computing (was 336 MW)941 MW in all2 buildings running - Epoch AI's projection
Building 1 operational. Based on the completion date to "build-out an office and data hall", stated in a regulatory filing.
336 MW for computing470 MW in all1 building running Land clearing continues.
No power for computing yetLand clearing begins for Buildings 1-2.
No power for computing yet
Power, chips, money and water.
Epoch AI's estimates as of Jan 15, 2026. IT power is what the computers draw; the total adds cooling and the rest of the building.
Costs are Epoch AI's model, about $38 billion per gigawatt of IT power in 2025 dollars, not company figures. Being built under construction, not yet drawing power for computing.
Owners, users and builders.
As Epoch AI records them. The owner is the company that owns the chips, which may not own the building. Who uses a site is often secret, so Epoch says how sure it is.
Abilene, Texas
Address in Epoch AI's records: 5502 Spinks Rd, Abilene, TX 79601.
Also in Texas
More of Microsoft's
Where the facts come from.
The primary sources Epoch AI lists for this site: permits, filings, company posts and reporting. Epoch's own page and workings are last.
- Bloomberg reporting that Oracle and OpenAI pulled out of expanding to these buildings, NVIDIA and Meta might replace thembloomberg.com
- Air Permit Application for the buildings, featuring blueprints on p.391tceq.texas.gov
- Aterioaterio.io
- Partnership Announcement with Microsoftx.com
- Crusoe Abilene Expansion in Epoch AI's directoryepoch.ai
- Epoch AI's calculations for this siteGoogle Sheets