Microsoft Fairwater Atlanta

Microsoft Fairwater Atlanta is an AI data center in Fayetteville, Georgia, owned by Microsoft and used by OpenAI (likely), Microsoft (likely). Epoch AI estimates it draws 636 MW for computing.

  • 636 MWfor computing now, #4 of the 96 Epoch AI tracks
  • $24 billionbuilt so far, Epoch AI's estimate in 2025 dollars
636 MW now
How it grew

Watched from above.

Epoch AI's dated notes on this site, from satellite images, permits and company statements, with the power it estimates at each step. Steps after today are its projection.

0 MW200 MW400 MW600 MW800 MW202420252026Apr 9, 2023: 0 MWOct 14, 2025: 321 MWJun 14, 2026: 636 MW0 MW200 MW400 MW600 MW800 MW202420252026Apr 9, 2023: 0 MWOct 14, 2025: 321 MWJun 14, 2026: 636 MW
  1. Building 3 and 4 are operational.

    636 MW for computing (was 321 MW)859 MW in all4 buildings running
  2. Building 4 still has some equipment strewn around the perimeter, so we think it is still going through commissioning. Two new buildings at the campus have shells underway, but we don't know if Microsoft is the tenant for those.

    321 MW for computing433 MW in all2 buildings running
  3. Building 4 roof is complete and all mechanical equipment appears to be installed. However, there is still a lot of construction activity around the building.

    321 MW for computing433 MW in all2 buildings running
  4. Building 1 and 2 are operational. Building 1 looked operational sooner, but the buildings are paired in the Fairwater design. The roof of Building 4 is almost complete, while mechanical equipment is still being installed.

    321 MW for computing433 MW in all2 buildings running
  5. Land clearing begins for southern part (Building 1-2)

    No power for computing yet
The numbers

Power, chips, money and water.

Epoch AI's estimates as of Jun 14, 2026. IT power is what the computers draw; the total adds cooling and the rest of the building.

636 MWIT power, for the computersJun 14, 2026
859 MWtotal power, cooling included
636 MWthe most Epoch AI projects here
769,000computing power, counted as Nvidia H100 chips
$24 billioncapital cost so far: $17 billion for chips and computers, $7.5 billion for the buildings, power and land
$24 billioncapital cost, finished
$0.6 billiona year to run (power, staff, upkeep, taxes, water)
No estimateof water use from Epoch AI for this site

Costs are Epoch AI's model, about $38 billion per gigawatt of IT power in 2025 dollars, not company figures. Running drawing power now, with no further growth in Epoch AI's projection.

Who's behind it

Owners, users and builders.

As Epoch AI records them. The owner is the company that owns the chips, which may not own the building. Who uses a site is often secret, so Epoch says how sure it is.

Owns the chips

Microsoft

Uses it

OpenAI (likely), Microsoft (likely)

Part of

Microsoft AI WAN

Investors

Not named

Builders

Not named

Power from

Georgia Power

What's inside

The chips, counted.

The AI chips at this site by Epoch AI's latest count. Most counts are estimates from the building's power; those marked disclosed come from the company.

ChipDesignerHow manySinceHow Epoch knows
B200Nvidia304,279 est.Jun 14, 2026All 4 buildings. Same model using total facility power.
Sources

Where the facts come from.

The primary sources Epoch AI lists for this site: permits, filings, company posts and reporting. Epoch's own page and workings are last.

  1. 2023 Air Permit applicationdrive.google.com
  2. YouTube video with aerial viewsyoutube.com
  3. OpenAI article mentioning they use Microsoft's Fairwater supercomputersopenai.com
  4. Bloomberg articlebloomberg.com
  5. Microsoft Fairwater Atlanta in Epoch AI's directoryepoch.ai
  6. Epoch AI's calculations for this siteGoogle Sheets

Data: Epoch AI, ‘AI data centers’, CC BY 4.0, read Nov 25, 2026. Page: Intelligence Progress, https://intelligenceprogress.com/data-centers/microsoft-fairwater-atlanta