Epoch AI's dated notes on this site, from satellite images, permits and company statements, with the power it estimates at each step. Steps after today are its projection.
Building 3 is operational. Based on the stated completion date in this regulatory filing
178 MW for computing (was 152 MW)231 MW in all3 buildings runningBuilding 3 is under construction. An outline is visible for the building which has similar dimensions to those deployed at the Meta Prometheus site.
152 MW for computing198 MW in all2 buildings runningBuilding 1 and 2 are operational. Activity related to the air quality permit (namely, emergency diesel generators) was reported to have started as of 2025-12-09. This is our best estimate, but note that the planned completion date in this regulatory filing is 2026-03-01.
152 MW for computing198 MW in all2 buildings runningBuilding 1 and 2 look complete from outside, with all electrical and cooling equipment installed. Space is cleared for Building 3.
No power for computing yetThe traditional Meta data center has been demolished mid-construction, in favor of Meta's new AI-optimized design.
No power for computing yetA traditional H-shaped Meta data center is partially built.
No power for computing yetLand clearing begins.
No power for computing yet
Power, chips, money and water.
Epoch AI's estimates as of Sep 30, 2026. IT power is what the computers draw; the total adds cooling and the rest of the building.
Costs are Epoch AI's model, about $38 billion per gigawatt of IT power in 2025 dollars, not company figures. Running drawing power now, with no further growth in Epoch AI's projection.
Owners, users and builders.
As Epoch AI records them. The owner is the company that owns the chips, which may not own the building. Who uses a site is often secret, so Epoch says how sure it is.
The chips, counted.
The AI chips at this site by Epoch AI's latest count. Most counts are estimates from the building's power; those marked disclosed come from the company.
| Chip | Designer | How many | Since | How Epoch knows |
|---|---|---|---|---|
| B300 | Nvidia | 80,139 est. | Sep 30, 2026 | Adds Building 3. Same model, adding Building 3 IT capacity (estimated from tent design power, ~40 MW total / PUE). |
Temple, Texas
Address in Epoch AI's records: 2310 Eberhardt Rd, Temple, TX 76504.
Also in Texas
More of Meta's
Where the facts come from.
The primary sources Epoch AI lists for this site: permits, filings, company posts and reporting. Epoch's own page and workings are last.
- JE Dunn project pagejedunn.com
- TDLR filingtdlr.texas.gov
- TDLR filingtdlr.texas.gov