Watched from above.
Epoch AI's dated notes on this site, from satellite images, permits and company statements, with the power it estimates at each step. Steps after today are its projection.
No notable changes since October.
190 MW for computing228 MW in all4 buildings runningSite already complete.
190 MW for computing228 MW in all4 buildings runningBuilding 3-4 operational, no visible construction.
190 MW for computing (was 95 MW)228 MW in all4 buildings runningBuilding 2 is operational. Estimated based on Microsoft H100 count 2023
95 MW for computing (was 48 MW)114 MW in all2 buildings runningBuilding 1 and 1st building on the site are operational. Foundation work begins on Building 2
48 MW for computing57 MW in all1 building runningLand clearing begins on the north part of the site
No power for computing yet
Power, chips, money and water.
Epoch AI's estimates as of Jun 16, 2026. IT power is what the computers draw; the total adds cooling and the rest of the building.
Costs are Epoch AI's model, about $38 billion per gigawatt of IT power in 2025 dollars, not company figures. Running drawing power now, with no further growth in Epoch AI's projection.
Owners, users and builders.
As Epoch AI records them. The owner is the company that owns the chips, which may not own the building. Who uses a site is often secret, so Epoch says how sure it is.
The chips, counted.
The AI chips at this site by Epoch AI's latest count. Most counts are estimates from the building's power; those marked disclosed come from the company.
| Chip | Designer | How many | Since | How Epoch knows |
|---|---|---|---|---|
| B200 | Nvidia | 45,455 est. | Mar 1, 2025 | Type estimated based on chip sales data. # of units estimated based on power for Building 3-4 |
| H100 | Nvidia | 32,680 est. | Jun 30, 2023 | Type estimated based on chip sales data. # of units estimated based on power for Building 2. |
| A100 | Nvidia | 25,000 est. | Jan 1, 2021 | Semianalysis believes "~25k A100 chips" are in Building 1, taking 2/5 data halls in the building. |
Cumming, Iowa
Address in Epoch AI's records: 5855 SW Kerry St, Cumming, IA 50061.
Also in Iowa
More of Microsoft's
Where the facts come from.
The primary sources Epoch AI lists for this site: permits, filings, company posts and reporting. Epoch's own page and workings are last.
- SemiAnalysis article with IT power estimations and detailing usage by OpenAI for training GPT 3.5newsletter.semianalysis.com
- DCD Article on site expansiondatacenterdynamics.com
- MISO Announcement reporting power for newest buildings, likely an overestimatecdn.misoenergy.org
- Microsoft article on data centers in Iowa used by OpenAInews.microsoft.com
- Microsoft Project Osmium in Epoch AI's directoryepoch.ai
- Epoch AI's calculations for this siteGoogle Sheets
Data: Epoch AI, ‘AI data centers’, CC BY 4.0, read Nov 25, 2026. Page: Intelligence Progress, https://intelligenceprogress.com/data-centers/microsoft-project-osmium