Running · Goodyear, Arizona

Microsoft Goodyear

Microsoft Goodyear is an AI data center in Goodyear, Arizona, owned by Microsoft and used by OpenAI (likely), Microsoft. Epoch AI estimates it draws 202 MW for computing.

  • 202 MWfor computing now, #25 of the 96 Epoch AI tracks
  • $7.7 billionbuilt so far, Epoch AI's estimate in 2025 dollars
202 MW now
How it grew

Watched from above.

Epoch AI's dated notes on this site, from satellite images, permits and company statements, with the power it estimates at each step. Steps after today are its projection.

0 MW50 MW100 MW150 MW200 MW250 MW20222023202420252026Jun 21, 2021: 0 MWApr 24, 2023: 40 MWJan 16, 2025: 81 MWSep 1, 2025: 202 MWApr 27, 2026: 202 MW0 MW50 MW100 MW150 MW200 MW250 MW20222023202420252026Jun 21, 2021: 0 MWApr 24, 2023: 40 MWJan 16, 2025: 81 MWSep 1, 2025: 202 MWApr 27, 2026: 202 MW
  1. Foundations appear to be underway for Building 5 and 6, just north of Building 4.

    202 MW for computing263 MW in all4 buildings running
  2. Confirmation that Building 3 and 4 look complete.

    202 MW for computing263 MW in all4 buildings running
  3. Building 3 and 4 operational. Based on interpolating satellite images from Sentinel-2 and Google Earth.

    202 MW for computing (was 81 MW)263 MW in all4 buildings running
  4. Building 2 operational. Based on interpolating satellite images from Sentinel-2 and Google Earth.

    81 MW for computing (was 40 MW)105 MW in all2 buildings running
  5. Building 1 operational. Based on interpolating satellite images from Sentinel-2 and Google Earth.

    40 MW for computing53 MW in all1 building running
  6. Land clearing begins for Building 1.

    No power for computing yet
The numbers

Power, chips, money and water.

Epoch AI's estimates as of Apr 27, 2026. IT power is what the computers draw; the total adds cooling and the rest of the building.

202 MWIT power, for the computersApr 27, 2026
263 MWtotal power, cooling included
202 MWthe most Epoch AI projects here
205,000computing power, counted as Nvidia H100 chips
$7.7 billioncapital cost so far: $5.3 billion for chips and computers, $2.4 billion for the buildings, power and land
$7.7 billioncapital cost, finished
$0.2 billiona year to run (power, staff, upkeep, taxes, water)
No estimateof water use from Epoch AI for this site

Costs are Epoch AI's model, about $38 billion per gigawatt of IT power in 2025 dollars, not company figures. Running drawing power now, with no further growth in Epoch AI's projection.

Who's behind it

Owners, users and builders.

As Epoch AI records them. The owner is the company that owns the chips, which may not own the building. Who uses a site is often secret, so Epoch says how sure it is.

Owns the chips

Microsoft

Uses it

OpenAI (likely), Microsoft

Part of

No wider project named

Investors

Not named

Builders

Not named

Power from

Not named

What's inside

The chips, counted.

The AI chips at this site by Epoch AI's latest count. Most counts are estimates from the building's power; those marked disclosed come from the company.

ChipDesignerHow manySinceHow Epoch knows
B200Nvidia58,121 est.Sep 1, 2025GB200 NVL72 assumed from operational date (Q3 2025) and insufficient cooling for B200 power density. Count = 2 buildings × chips per building, from chiller-based IT capacity / server power × 72.
H100Nvidia58,302 est.Jan 16, 2025Building 2 also H100. Count = cumulative H100s across Buildings 1 and 2, each derived from IT capacity / server power × 8.
Sources

Where the facts come from.

The primary sources Epoch AI lists for this site: permits, filings, company posts and reporting. Epoch's own page and workings are last.

  1. Maricopa County mapgis.maricopa.gov
  2. Dust control permitedms.maricopa.gov
  3. SemiAnalysis articlenewsletter.semianalysis.com
  4. Microsoft Goodyear in Epoch AI's directoryepoch.ai
  5. Epoch AI's calculations for this siteGoogle Sheets

Data: Epoch AI, ‘AI data centers’, CC BY 4.0, read Nov 25, 2026. Page: Intelligence Progress, https://intelligenceprogress.com/data-centers/microsoft-goodyear