CoreWeave Denton TX

CoreWeave Denton TX is an AI data center in Denton, Texas, owned by CoreWeave and used by OpenAI (likely). Epoch AI estimates it draws 262 MW for computing, rising to 282 MW by May 2027.

  • 262 MWfor computing now, #14 of the 96 Epoch AI tracks
  • 282 MWplanned by May 2027
  • $9.9 billionbuilt so far, Epoch AI's estimate in 2025 dollars
262 MW now
How it grew

Watched from above.

Epoch AI's dated notes on this site, from satellite images, permits and company statements, with the power it estimates at each step. Steps after today are its projection.

0 MW100 MW200 MW300 MW400 MW202520262027Nov 1, 2024: 0 MWMay 31, 2025: 8 MWDec 31, 2025: 67 MWFeb 23, 2026: 131 MWJul 3, 2026: 262 MWMay 31, 2027: 282 MW (projected)0 MW100 MW200 MW300 MW400 MW202520262027Nov 1, 2024: 0 MWMay 31, 2025: 8 MWDec 31, 2025: 67 MWFeb 23, 2026: 131 MWJul 3, 2026: 262 MWMay 31, 2027: 282 MW (projected)
  1. Epoch AI's projection

    Building 8 projected operational. TDLR project TABS2026028247 schedules Building A's data-hall fit-out for completion by this date.

    282 MW for computing (was 262 MW)395 MW in all8 buildings running
  2. Building 8 interior fit-out scheduled to begin. TDLR project TABS2026028247 schedules a $110M interior fit-out of the existing 27,678.22 sq ft Building A as a data hall beginning September 1, 2026.

    262 MW for computing367 MW in all7 buildings running
  3. Buildings 1-7 are operational and running, with no construction work visible. This is based on both satellite imagery, and the Q2 2026 Earnings call stating the campus was operational by midyear 2026.

    262 MW for computing (was 131 MW)367 MW in all7 buildings running
  4. Buildings 1-3 (Denton North) are fully operational running AI (Denton North at 90 MW, Denton South partially running at 41). This is according to an earnings call from this date.

    131 MW for computing183 MW in all4 buildings running
  5. Buildings 1-3 (Denton North) are largely built out/operational, and Denton South has its first data hall plus support equipment substantially installed. Remaining Denton South buildings (4-7) still under construction. This is according to satellite imagery.

    131 MW for computing (was 67 MW)183 MW in all4 buildings running
  6. Half the campus energized. 67 billable MW are now dedicated to CoreWeave's GPUs across three buildings.

    67 MW for computing (was 8 MW)94 MW in all3 buildings running
  7. First 8 MW billable tranche dedicated to AI starts running at the site, with another 40 scheduled by the end of the quarter.

    8 MW for computing11 MW in all1 building running
  8. Construction start - The Texas Department of Licensing and Regulation reports Core Scientific is converting existing Bitcoin mining buildings into AI data centers, planning to build AROUND the existing Denton Energy Center.

    No power for computing yet
The numbers

Power, chips, money and water.

Epoch AI's estimates as of Sep 1, 2026. IT power is what the computers draw; the total adds cooling and the rest of the building.

262 MWIT power, for the computersSep 1, 2026
367 MWtotal power, cooling included
282 MWIT power planned by May 2027
253,000computing power, counted as Nvidia H100 chips
$9.9 billioncapital cost so far: $6.8 billion for chips and computers, $3.1 billion for the buildings, power and land
$11 billioncapital cost once finished, by May 2027
$0.2 billiona year to run (power, staff, upkeep, taxes, water)
No estimateof water use from Epoch AI for this site

Costs are Epoch AI's model, about $38 billion per gigawatt of IT power in 2025 dollars, not company figures. Running and growing drawing power now, and Epoch AI projects more to come.

Who's behind it

Owners, users and builders.

As Epoch AI records them. The owner is the company that owns the chips, which may not own the building. Who uses a site is often secret, so Epoch says how sure it is.

Owns the chips

CoreWeave

Uses it

OpenAI (likely)

Part of

No wider project named

Investors

Not named

Builders

Not named

Power from

Not named

What's inside

The chips, counted.

The AI chips at this site by Epoch AI's latest count. Most counts are estimates from the building's power; those marked disclosed come from the company.

ChipDesignerHow manySinceHow Epoch knows
B200Nvidia100,000 est.Jul 3, 2026This is the estimated final CoreWeave AI load. Since it's disclosed to be >50,000 GPUs at ~130 MW, a safe estimate can be 100,000 GPUs at the full 260 MW. (MarketBeat)
Sources

Where the facts come from.

The primary sources Epoch AI lists for this site: permits, filings, company posts and reporting. Epoch's own page and workings are last.

  1. Core Scientific - CoreWeave Announce 1.2B expansion in Denton, TXinvestors.corescientific.com
  2. Core Scientific - Denton Datacenter Official Sitecorescientific.com
  3. TMF - Core Scientific Q4 2025 Earnings Transcriptfool.com
  4. WSJ - plans to rent to OpenAIwsj.com
  5. CoreWeave Denton TX in Epoch AI's directoryepoch.ai
  6. Epoch AI's calculations for this siteGoogle Sheets

Data: Epoch AI, ‘AI data centers’, CC BY 4.0, read Nov 25, 2026. Page: Intelligence Progress, https://intelligenceprogress.com/data-centers/coreweave-denton-tx