Wednesday, November 25, 2026 · Edition updated 6:00 AM ETWED, NOV 25 editionNext edition in Next in --:--:--
Intelligence Progress
Running and growing · Chester, Virginia

CoreWeave Chester VA

CoreWeave Chester VA is an AI data center in Chester, Virginia, owned by CoreWeave and used by OpenAI (possibly). Epoch AI estimates it draws 82 MW for computing, rising to 113 MW by Jun 2027.

  • 82 MWfor computing now, #57 of the 96 Epoch AI tracks
  • 113 MWplanned by Jun 2027
  • $3.1 billionbuilt so far, Epoch AI's estimate in 2025 dollars
82 MW now
How it grew

Watched from above.

Epoch AI's dated notes on this site, from satellite images, permits and company statements, with the power it estimates at each step. Steps after today are its projection.

0 MW50 MW100 MW150 MW2024202520262027Sep 18, 2023: 0 MWJan 31, 2024: 18 MWApr 30, 2024: 27 MWMay 20, 2026: 82 MWJun 30, 2027: 113 MW (projected)0 MW50 MW100 MW150 MW2024202520262027Sep 18, 2023: 0 MWJan 31, 2024: 18 MWApr 30, 2024: 27 MWMay 20, 2026: 82 MWJun 30, 2027: 113 MW (projected)
  1. Epoch AI's projection

    Buildings 3 is estimated complete by the end of Q1 2027, based on the current PowerHouse schedule. Added another three months to account for commissioning and server installation.

    113 MW for computing (was 82 MW)197 MW in all3 buildings running
  2. Based on satellite imagery, Building 3 has cleared its land and is beginning construction. Building 2 is operational judging from the colored motion artifacts on the cooling tower fans.

    82 MW for computing (was 27 MW)114 MW in all2 buildings running
  3. Satellite imagery shows Building 1 complete, with Building 2's yard work and early construction visible. Building 3 hasn't started yet, since the old building is still there.

    27 MW for computing38 MW in all1 building running
  4. Building 1 is scheduled to be fully online by this point, so we count the full 27 MW as operational here.

    27 MW for computing (was 18 MW)38 MW in all1 building running
  5. Building 1's second data hall scheduled to come online this month.

    18 MW for computing25 MW in all1 building running
  6. Conversion starts at CTP-01 (Building 1). The data center was formerly owned by Capital One, now leased to CoreWeave. Source: https://www.datacenterdynamics.com/en/news/chirisa-secures-200-million-loan-to-fit-out-virginia-data-center-for-coreweave/

    No power for computing yet
The numbers

Power, chips, money and water.

Epoch AI's estimates as of May 20, 2026. IT power is what the computers draw; the total adds cooling and the rest of the building.

82 MWIT power, for the computersMay 20, 2026
114 MWtotal power, cooling included
113 MWIT power planned by Jun 2027
88,000computing power, counted as Nvidia H100 chips
$3.1 billioncapital cost so far: $2.1 billion for chips and computers, $1.0 billion for the buildings, power and land
$4.3 billioncapital cost once finished, by Jun 2027
$0.1 billiona year to run (power, staff, upkeep, taxes, water)
No estimateof water use from Epoch AI for this site

Costs are Epoch AI's model, about $38 billion per gigawatt of IT power in 2025 dollars, not company figures. Running and growing drawing power now, and Epoch AI projects more to come.

Who's behind it

Owners, users and builders.

As Epoch AI records them. The owner is the company that owns the chips, which may not own the building. Who uses a site is often secret, so Epoch says how sure it is.

Owns the chips

CoreWeave

Uses it

OpenAI (possibly)

Part of

No wider project named

Investors

Not named

Builders

Not named

Power from

Not named

What's inside

The chips, counted.

The AI chips at this site by Epoch AI's latest count. Most counts are estimates from the building's power; those marked disclosed come from the company.

ChipDesignerHow manySinceHow Epoch knows
B200Nvidia26,162 est.May 20, 2026Estimated Building 2 B200 count using Building 2’s share of modeled CTP-02/03 IT power.
H100Nvidia22,100 est.Apr 30, 2024Full CTP-01 estimate using the reported 27 MW critical capacity. Chip type and quantity are estimated from the power model.
Sources

Where the facts come from.

The primary sources Epoch AI lists for this site: permits, filings, company posts and reporting. Epoch's own page and workings are last.

  1. Chirisa secures $200 million loan to fit out VA Data center for CoreWeavedatacenterdynamics.com
  2. Blue Owl-led JV secures $750m to build out data centers for CoreWeavedatacenterdynamics.com
  3. Chirisa offers former Capital One data center in Virginia to hyperscalersdatacenterdynamics.com
  4. CoreWeave Chester VA in Epoch AI's directoryepoch.ai
  5. Epoch AI's calculations for this siteGoogle Sheets

Data: Epoch AI, ‘AI data centers’, CC BY 4.0, read Nov 25, 2026. Page: Intelligence Progress, https://intelligenceprogress.com/data-centers/coreweave-chester-va