CoreWeave Marble NC

CoreWeave Marble NC is an AI data center in Marble, North Carolina, owned by CoreWeave and used by OpenAI (possibly). Epoch AI estimates it draws 65 MW for computing.

  • 65 MWfor computing now, #65 of the 96 Epoch AI tracks
  • $2.5 billionbuilt so far, Epoch AI's estimate in 2025 dollars
65 MW now
How it grew

Watched from above.

Epoch AI's dated notes on this site, from satellite images, permits and company statements, with the power it estimates at each step. Steps after today are its projection.

0 MW20 MW40 MW60 MW80 MW20252026Jun 25, 2024: 0 MWMar 13, 2026: 36 MWMay 6, 2026: 65 MW0 MW20 MW40 MW60 MW80 MW20252026Jun 25, 2024: 0 MWMar 13, 2026: 36 MWMay 6, 2026: 65 MW
  1. Core Scientific said Marble was fully handed over to CoreWeave with about 65 MW of billable customer power online.

    65 MW for computing (was 36 MW)91 MW in all1 building running
  2. Satellite imagery shows the main data hall and southern utility yard substantially complete. No new public MW disclosure, so this keeps the March 2026 public 36 MW state.

    36 MW for computing50 MW in all1 building running
  3. The site has been energized. Two of three data halls had been delivered at 37 billable MW, supporting about 15000 Grace Blackwell GPUs. The third hall was still in commissioning.

    36 MW for computing50 MW in all1 building running
  4. Core Scientific announced that CoreWeave would receive about 70 MW of HPC infrastructure from 100 MW of owned infrastructure. Site modifications were expected to begin in H2 2024.

    No power for computing yet
The numbers

Power, chips, money and water.

Epoch AI's estimates as of May 6, 2026. IT power is what the computers draw; the total adds cooling and the rest of the building.

65 MWIT power, for the computersMay 6, 2026
91 MWtotal power, cooling included
65 MWthe most Epoch AI projects here
79,000computing power, counted as Nvidia H100 chips
$2.5 billioncapital cost so far: $1.7 billion for chips and computers, $0.8 billion for the buildings, power and land
$2.5 billioncapital cost, finished
$0.1 billiona year to run (power, staff, upkeep, taxes, water)
No estimateof water use from Epoch AI for this site

Costs are Epoch AI's model, about $38 billion per gigawatt of IT power in 2025 dollars, not company figures. Running drawing power now, with no further growth in Epoch AI's projection.

Who's behind it

Owners, users and builders.

As Epoch AI records them. The owner is the company that owns the chips, which may not own the building. Who uses a site is often secret, so Epoch says how sure it is.

Owns the chips

CoreWeave

Uses it

OpenAI (possibly)

Part of

No wider project named

Investors

Not named

Builders

Not named

Power from

Not named

What's inside

The chips, counted.

The AI chips at this site by Epoch AI's latest count. Most counts are estimates from the building's power; those marked disclosed come from the company.

ChipDesignerHow manySinceHow Epoch knows
B200Nvidia31,100 est.May 6, 2026Core Scientific reported Marble as fully handed over to CoreWeave at about 65 MW of leased customer power. Chip type and count are not disclosed for Marble. Estimate assumes GB200 NVL72 racks with 72 Blackwell GPUs per rack and 0.132 MW per rack. (Core Scientific Fiscal Q1 2026 Earnings Call)
Sources

Where the facts come from.

The primary sources Epoch AI lists for this site: permits, filings, company posts and reporting. Epoch's own page and workings are last.

  1. Core Scientific - Q1 2026 Fiscal Earnings Callinvestors.corescientific.com
  2. Core Scientific - Official Marble, NC Datacenter pagecorescientific.com
  3. Core Scientific - Q1 2025 Earnings Presentationinvestors.corescientific.com
  4. Core Scientific - June 2024 Investor and Analyst Daysec.gov
  5. CoreWeave Marble NC in Epoch AI's directoryepoch.ai
  6. Epoch AI's calculations for this siteGoogle Sheets

Data: Epoch AI, ‘AI data centers’, CC BY 4.0, read Nov 25, 2026. Page: Intelligence Progress, https://intelligenceprogress.com/data-centers/coreweave-marble-nc