Epoch AI's dated notes on this site, from satellite images, permits and company statements, with the power it estimates at each step. Steps after today are its projection.
Core Scientific said Marble was fully handed over to CoreWeave with about 65 MW of billable customer power online.
65 MW for computing (was 36 MW)91 MW in all1 building runningSatellite imagery shows the main data hall and southern utility yard substantially complete. No new public MW disclosure, so this keeps the March 2026 public 36 MW state.
36 MW for computing50 MW in all1 building runningThe site has been energized. Two of three data halls had been delivered at 37 billable MW, supporting about 15000 Grace Blackwell GPUs. The third hall was still in commissioning.
36 MW for computing50 MW in all1 building runningCore Scientific announced that CoreWeave would receive about 70 MW of HPC infrastructure from 100 MW of owned infrastructure. Site modifications were expected to begin in H2 2024.
No power for computing yet
Power, chips, money and water.
Epoch AI's estimates as of May 6, 2026. IT power is what the computers draw; the total adds cooling and the rest of the building.
Costs are Epoch AI's model, about $38 billion per gigawatt of IT power in 2025 dollars, not company figures. Running drawing power now, with no further growth in Epoch AI's projection.
Owners, users and builders.
As Epoch AI records them. The owner is the company that owns the chips, which may not own the building. Who uses a site is often secret, so Epoch says how sure it is.
The chips, counted.
The AI chips at this site by Epoch AI's latest count. Most counts are estimates from the building's power; those marked disclosed come from the company.
| Chip | Designer | How many | Since | How Epoch knows |
|---|---|---|---|---|
| B200 | Nvidia | 31,100 est. | May 6, 2026 | Core Scientific reported Marble as fully handed over to CoreWeave at about 65 MW of leased customer power. Chip type and count are not disclosed for Marble. Estimate assumes GB200 NVL72 racks with 72 Blackwell GPUs per rack and 0.132 MW per rack. (Core Scientific Fiscal Q1 2026 Earnings Call) |
Marble, North Carolina
Address in Epoch AI's records: 155 Palmer Ln, Marble, NC 28905.
More of CoreWeave's
Where the facts come from.
The primary sources Epoch AI lists for this site: permits, filings, company posts and reporting. Epoch's own page and workings are last.
- Core Scientific - Q1 2026 Fiscal Earnings Callinvestors.corescientific.com
- Core Scientific - Official Marble, NC Datacenter pagecorescientific.com
- Core Scientific - Q1 2025 Earnings Presentationinvestors.corescientific.com
- Core Scientific - June 2024 Investor and Analyst Daysec.gov
- CoreWeave Marble NC in Epoch AI's directoryepoch.ai
- Epoch AI's calculations for this siteGoogle Sheets
Data: Epoch AI, ‘AI data centers’, CC BY 4.0, read Nov 25, 2026. Page: Intelligence Progress, https://intelligenceprogress.com/data-centers/coreweave-marble-nc