Wednesday, November 25, 2026 · Edition updated 6:00 AM ETWED, NOV 25 editionNext edition in Next in --:--:--
Intelligence Progress
Being built · Fairfax, Iowa

QTS Cedar Rapids

QTS Cedar Rapids is an AI data center in Fairfax, Iowa, owned by Meta (possibly) and used by Meta (possibly). It is being built; Epoch AI projects 1.13 GW for computing by Nov 2027.

  • 1.13 GWplanned by Nov 2027
Being built
How it grew

Watched from above.

Epoch AI's dated notes on this site, from satellite images, permits and company statements, with the power it estimates at each step. Steps after today are its projection.

0 MW200 MW400 MW600 MW800 MW1 GW1.2 GW1.4 GW20262027Jan 17, 2025: 0 MWDec 31, 2026: 448 MW (projected)Nov 15, 2027: 1.13 GW (projected)0 MW200 MW400 MW600 MW800 MW1 GW1.2 GW1.4 GW20262027Jan 17, 2025: 0 MWDec 31, 2026: 448 MW (projected)Nov 15, 2027: 1.13 GW (projected)
  1. Epoch AI's projection

    Buildings 4-7 are operational. Based on the expected completion date reported by local news: “A QTS spokesperson said in July [2025] that [...] The second phase is expected to be completed in late 2027."

    1.13 GW for computing (was 448 MW)1.59 GW in all7 buildings running
  2. Epoch AI's projection

    Buildings 1-3 are operational. Based on the visible progress in the October satellite image, and the expected completion date reported by local news: “A QTS spokesperson said in July [2025] that the first phase of the project was expected to be completed in late 2026."

    448 MW for computing627 MW in all3 buildings running
  3. Buildings 1–3 look externally complete, with the air-cooled chillers fully installed, and surrounding yard work cleared. The many cars and trucks parked beside the buildings suggest commissioning is still underway, so we’re not counting any buildings operational yet. Buildings 4-6 shells appear complete, and Building 7 is nearly 90% roofed. This is based on high-resolution satellite imagery from this date.

    No power for computing yet
  4. Similar to April, Buildings 1-3 shells look complete. Buildings 4-6 are still far along, and the eastern Building 7 foundation is still underway.

    No power for computing yet
  5. Based on satellite imagery, the Buildings 1-3 shells look complete. Buildings 4-6 are far along, with roofs largely in place, while the eastern Building 7 foundation is well underway. No buildings operational yet.

    No power for computing yet
  6. Building 1 roof complete, with air-cooled chillers in place. Building 2 and 3 roofs are partly completed. Building 4 and 5 have a foundation.

    No power for computing yet
  7. Land clearing begins for Building 1-3.

    No power for computing yet
The numbers

Power, chips, money and water.

Epoch AI's estimates as of Oct 23, 2026. IT power is what the computers draw; the total adds cooling and the rest of the building.

None yetIT power, for the computersOct 23, 2026
None yettotal power, cooling included
1.13 GWIT power planned by Nov 2027
None yetcomputing power, counted as Nvidia H100 chips
–capital cost so far
$43 billioncapital cost once finished, by Nov 2027
–a year to run (power, staff, upkeep, taxes, water)
No estimateof water use from Epoch AI for this site

Costs are Epoch AI's model, about $38 billion per gigawatt of IT power in 2025 dollars, not company figures. Being built under construction, not yet drawing power for computing.

Who's behind it

Owners, users and builders.

As Epoch AI records them. The owner is the company that owns the chips, which may not own the building. Who uses a site is often secret, so Epoch says how sure it is.

Owns the chips

Meta (possibly)

Uses it

Meta (possibly)

Part of

No wider project named

Investors

Not named

Builders

Not named

Power from

Alliant Energy

Sources

Where the facts come from.

The primary sources Epoch AI lists for this site: permits, filings, company posts and reporting. Epoch's own page and workings are last.

  1. MISO new load announcementscdn.misoenergy.org
  2. Article by The Gazettethegazette.com
  3. Article by Corridor Business Journalcorridorbusiness.com
  4. Post by GLD Commercialgldcommercial.com
  5. Post by SemiAnalysisnewsletter.semianalysis.com
  6. QTS Cedar Rapids in Epoch AI's directoryepoch.ai
  7. Epoch AI's calculations for this siteGoogle Sheets

Data: Epoch AI, ‘AI data centers’, CC BY 4.0, read Nov 25, 2026. Page: Intelligence Progress, https://intelligenceprogress.com/data-centers/qts-cedar-rapids