Watched from above.
Epoch AI's dated notes on this site, from satellite images, permits and company statements, with the power it estimates at each step. Steps after today are its projection.
- Epoch AI's projection
Buildings 4-7 are operational. Based on the expected completion date reported by local news: “A QTS spokesperson said in July [2025] that [...] The second phase is expected to be completed in late 2027."
1.13 GW for computing (was 448 MW)1.59 GW in all7 buildings running - Epoch AI's projection
Buildings 1-3 are operational. Based on the visible progress in the October satellite image, and the expected completion date reported by local news: “A QTS spokesperson said in July [2025] that the first phase of the project was expected to be completed in late 2026."
448 MW for computing627 MW in all3 buildings running Buildings 1–3 look externally complete, with the air-cooled chillers fully installed, and surrounding yard work cleared. The many cars and trucks parked beside the buildings suggest commissioning is still underway, so we’re not counting any buildings operational yet. Buildings 4-6 shells appear complete, and Building 7 is nearly 90% roofed. This is based on high-resolution satellite imagery from this date.
No power for computing yetSimilar to April, Buildings 1-3 shells look complete. Buildings 4-6 are still far along, and the eastern Building 7 foundation is still underway.
No power for computing yetBased on satellite imagery, the Buildings 1-3 shells look complete. Buildings 4-6 are far along, with roofs largely in place, while the eastern Building 7 foundation is well underway. No buildings operational yet.
No power for computing yetBuilding 1 roof complete, with air-cooled chillers in place. Building 2 and 3 roofs are partly completed. Building 4 and 5 have a foundation.
No power for computing yetLand clearing begins for Building 1-3.
No power for computing yet
Power, chips, money and water.
Epoch AI's estimates as of Oct 23, 2026. IT power is what the computers draw; the total adds cooling and the rest of the building.
Costs are Epoch AI's model, about $38 billion per gigawatt of IT power in 2025 dollars, not company figures. Being built under construction, not yet drawing power for computing.
Owners, users and builders.
As Epoch AI records them. The owner is the company that owns the chips, which may not own the building. Who uses a site is often secret, so Epoch says how sure it is.
Fairfax, Iowa
Address in Epoch AI's records: 6200 76th Ave SW, Fairfax, IA 52228.
Also in Iowa
More of Meta's
Where the facts come from.
The primary sources Epoch AI lists for this site: permits, filings, company posts and reporting. Epoch's own page and workings are last.
- MISO new load announcementscdn.misoenergy.org
- Article by The Gazettethegazette.com
- Article by Corridor Business Journalcorridorbusiness.com
- Post by GLD Commercialgldcommercial.com
- Post by SemiAnalysisnewsletter.semianalysis.com
- QTS Cedar Rapids in Epoch AI's directoryepoch.ai
- Epoch AI's calculations for this siteGoogle Sheets
Data: Epoch AI, ‘AI data centers’, CC BY 4.0, read Nov 25, 2026. Page: Intelligence Progress, https://intelligenceprogress.com/data-centers/qts-cedar-rapids