Running and growing · Cheyenne, Wyoming

Meta Cheyenne

Meta Cheyenne is an AI data center in Cheyenne, Wyoming, owned by Meta and used by Meta. Epoch AI estimates it draws 152 MW for computing, rising to 207 MW by Feb 2027.

  • 152 MWfor computing now, #39 of the 96 Epoch AI tracks
  • 207 MWplanned by Feb 2027
  • $5.8 billionbuilt so far, Epoch AI's estimate in 2025 dollars
152 MW now
How it grew

Watched from above.

Epoch AI's dated notes on this site, from satellite images, permits and company statements, with the power it estimates at each step. Steps after today are its projection.

0 MW50 MW100 MW150 MW200 MW250 MW202520262027May 1, 2024: 0 MWJul 25, 2026: 152 MWFeb 15, 2027: 207 MW (projected)0 MW50 MW100 MW150 MW200 MW250 MW202520262027May 1, 2024: 0 MWJul 25, 2026: 152 MWFeb 15, 2027: 207 MW (projected)
  1. Epoch AI's projection

    Buildings 3 and 4 are similar in style and size to the ones seen at the Prometheus site, we estimate their operability based on that timeline.

    207 MW for computing (was 152 MW)249 MW in all4 buildings running
  2. Both buildings estimated to be operational.

    152 MW for computing182 MW in all2 buildings running
  3. Building 1 shell and cooling looks complete, Building 2 roof almost complete.

    No power for computing yet
  4. Structure for Building 1 and 2 under construction.

    No power for computing yet
  5. Land clearing begins.

    No power for computing yet
The numbers

Power, chips, money and water.

Epoch AI's estimates as of Jul 25, 2026. IT power is what the computers draw; the total adds cooling and the rest of the building.

152 MWIT power, for the computersJul 25, 2026
182 MWtotal power, cooling included
207 MWIT power planned by Feb 2027
173,000computing power, counted as Nvidia H100 chips
$5.8 billioncapital cost so far: $4.0 billion for chips and computers, $1.8 billion for the buildings, power and land
$7.8 billioncapital cost once finished, by Feb 2027
$0.1 billiona year to run (power, staff, upkeep, taxes, water)
No estimateof water use from Epoch AI for this site

Costs are Epoch AI's model, about $38 billion per gigawatt of IT power in 2025 dollars, not company figures. Running and growing drawing power now, and Epoch AI projects more to come.

Who's behind it

Owners, users and builders.

As Epoch AI records them. The owner is the company that owns the chips, which may not own the building. Who uses a site is often secret, so Epoch says how sure it is.

Owns the chips

Meta

Uses it

Meta

Part of

No wider project named

Investors

Not named

Builders

Not named

Power from

Not named

What's inside

The chips, counted.

The AI chips at this site by Epoch AI's latest count. Most counts are estimates from the building's power; those marked disclosed come from the company.

ChipDesignerHow manySinceHow Epoch knows
B300Nvidia68,367 est.Jul 25, 2026Assumed based on chip ownership data, number calculated from estimated IT power
Sources

Where the facts come from.

The primary sources Epoch AI lists for this site: permits, filings, company posts and reporting. Epoch's own page and workings are last.

  1. Meta Introduction to the Cheyenne Projectdatacenters.atmeta.com
  2. Fortis Construction announcementfortisconstruction.com
  3. Press announcement suggesting a 2027 operational datecheyenneleads.org
  4. Meta Cheyenne in Epoch AI's directoryepoch.ai
  5. Epoch AI's calculations for this siteGoogle Sheets