Epoch AI's dated notes on this site, from satellite images, permits and company statements, with the power it estimates at each step. Steps after today are its projection.
- Epoch AI's projection
Buildings 3 and 4 are similar in style and size to the ones seen at the Prometheus site, we estimate their operability based on that timeline.
207 MW for computing (was 152 MW)249 MW in all4 buildings running Both buildings estimated to be operational.
152 MW for computing182 MW in all2 buildings runningBuilding 1 shell and cooling looks complete, Building 2 roof almost complete.
No power for computing yetStructure for Building 1 and 2 under construction.
No power for computing yetLand clearing begins.
No power for computing yet
Power, chips, money and water.
Epoch AI's estimates as of Jul 25, 2026. IT power is what the computers draw; the total adds cooling and the rest of the building.
Costs are Epoch AI's model, about $38 billion per gigawatt of IT power in 2025 dollars, not company figures. Running and growing drawing power now, and Epoch AI projects more to come.
Owners, users and builders.
As Epoch AI records them. The owner is the company that owns the chips, which may not own the building. Who uses a site is often secret, so Epoch says how sure it is.
The chips, counted.
The AI chips at this site by Epoch AI's latest count. Most counts are estimates from the building's power; those marked disclosed come from the company.
| Chip | Designer | How many | Since | How Epoch knows |
|---|---|---|---|---|
| B300 | Nvidia | 68,367 est. | Jul 25, 2026 | Assumed based on chip ownership data, number calculated from estimated IT power |
Cheyenne, Wyoming
Address in Epoch AI's records: Cheyenne, WY 82007, USA.
More of Meta's
Where the facts come from.
The primary sources Epoch AI lists for this site: permits, filings, company posts and reporting. Epoch's own page and workings are last.
- Meta Introduction to the Cheyenne Projectdatacenters.atmeta.com
- Fortis Construction announcementfortisconstruction.com
- Press announcement suggesting a 2027 operational datecheyenneleads.org
- Meta Cheyenne in Epoch AI's directoryepoch.ai