Google New Albany

Google New Albany is an AI data center in New Albany, Ohio, owned by Google and used by Google DeepMind (possibly). Epoch AI estimates it draws 333 MW for computing.

  • 333 MWfor computing now, #11 of the 96 Epoch AI tracks
  • $13 billionbuilt so far, Epoch AI's estimate in 2025 dollars
333 MW now
How it grew

Watched from above.

Epoch AI's dated notes on this site, from satellite images, permits and company statements, with the power it estimates at each step. Steps after today are its projection.

0 MW100 MW200 MW300 MW400 MW20222023202420252026Mar 1, 2021: 0 MWApr 20, 2024: 67 MWSep 13, 2024: 144 MWJun 1, 2025: 222 MWOct 14, 2025: 333 MWMay 18, 2026: 333 MW0 MW100 MW200 MW300 MW400 MW20222023202420252026Mar 1, 2021: 0 MWApr 20, 2024: 67 MWSep 13, 2024: 144 MWJun 1, 2025: 222 MWOct 14, 2025: 333 MWMay 18, 2026: 333 MW
  1. Building 5 has all cooling towers installed, and all other components look complete, but there is still light work around the building. Based on that, we estimate 3 more months until operational.

    333 MW for computing400 MW in all4 buildings running
  2. Building 5 has more cooling towers installed but not complete, and the roof is almost complete.

    333 MW for computing400 MW in all4 buildings running
  3. Water vapor from cooling towers is present across Building 1-4, confirming their operation. Building 5 roof is still incomplete, but most backup generators and 5 cooling towers have been installed.

    333 MW for computing400 MW in all4 buildings running
  4. Building 4 is operational, based on all cooling units and tanks installed, minimal construction work around the building. Building 5 roof is half complete. About half of the backup generators are in place. One cooling tower is partly built.

    333 MW for computing (was 222 MW)400 MW in all4 buildings running
  5. Building 3 is operational, based on all cooling units and tanks installed, minimal construction work around the building. Building 4 still has some work around the cooling towers. Work is underway on Building 5 - some walls and a few backup generators are in place.

    222 MW for computing (was 144 MW)267 MW in all3 buildings running
  6. Building 2 is operational. Google Earth imagery shows 6 cooling towers installed as of 2024-04-20, and a final 7th unit appeared as of 2024-09-13, with minimal construction around the building. Building 3 roof is also complete.

    144 MW for computing (was 67 MW)173 MW in all2 buildings running
  7. Building 1 is operational. Based on ~7 months since roof being completed, and cooling towers being installed sometime within that period. Building 2 roof is complete.

    67 MW for computing80 MW in all1 building running
  8. Land clearing begins.

    No power for computing yet
The numbers

Power, chips, money and water.

Epoch AI's estimates as of May 18, 2026. IT power is what the computers draw; the total adds cooling and the rest of the building.

333 MWIT power, for the computersMay 18, 2026
400 MWtotal power, cooling included
333 MWthe most Epoch AI projects here
324,000computing power, counted as Nvidia H100 chips
$13 billioncapital cost so far: $8.7 billion for chips and computers, $3.9 billion for the buildings, power and land
$13 billioncapital cost, finished
$0.3 billiona year to run (power, staff, upkeep, taxes, water)
966,000 gallonsof water a day, Epoch AI's estimate (Sep 13, 2024)

Costs are Epoch AI's model, about $38 billion per gigawatt of IT power in 2025 dollars, not company figures. Running drawing power now, with no further growth in Epoch AI's projection.

Who's behind it

Owners, users and builders.

As Epoch AI records them. The owner is the company that owns the chips, which may not own the building. Who uses a site is often secret, so Epoch says how sure it is.

Owns the chips

Google

Uses it

Google DeepMind (possibly)

Part of

No wider project named

Investors

Not named

Builders

Not named

Power from

Not named

What's inside

The chips, counted.

The AI chips at this site by Epoch AI's latest count. Most counts are estimates from the building's power; those marked disclosed come from the company.

ChipDesignerHow manySinceHow Epoch knows
TPU v6eGoogle262,731 est.Oct 14, 2025Cumulative through Building 4 (Q3 FY25 mix for new capacity; lagged one quarter from the operational date to account for purchase-to-operation delay). Chip type and quantity derived from Timeline power, TPU_Production shares, and per-chip TDP from Parameters.
TPU v5eGoogle247,041 est.Sep 13, 2024Cumulative through Building 2 (Q3 FY24 mix for new capacity; lagged one quarter from the operational date to account for purchase-to-operation delay). Chip type and quantity derived from Timeline power, TPU_Production shares, and per-chip TDP from Parameters.
TPU v5pGoogle66,612 est.Jun 1, 2025Cumulative through Building 3 (Q2 FY25 mix for new capacity; lagged one quarter from the operational date to account for purchase-to-operation delay). Chip type and quantity derived from Timeline power, TPU_Production shares, and per-chip TDP from Parameters.
Sources

Where the facts come from.

The primary sources Epoch AI lists for this site: permits, filings, company posts and reporting. Epoch's own page and workings are last.

  1. Draft basis of air permit for Google Omaha, a similar data centerdrive.google.com
  2. 2025 Environmental Reportsustainability.google
  3. Google New Albany in Epoch AI's directoryepoch.ai
  4. Epoch AI's calculations for this siteGoogle Sheets

Data: Epoch AI, ‘AI data centers’, CC BY 4.0, read Nov 25, 2026. Page: Intelligence Progress, https://intelligenceprogress.com/data-centers/google-new-albany