Running · Papillion, Nebraska

Google Papillion

Google Papillion is an AI data center in Papillion, Nebraska, owned by Google and used by Google DeepMind (possibly). Epoch AI estimates it draws 237 MW for computing.

  • 237 MWfor computing now, #18 of the 96 Epoch AI tracks
  • $9.0 billionbuilt so far, Epoch AI's estimate in 2025 dollars
237 MW now
How it grew

Watched from above.

Epoch AI's dated notes on this site, from satellite images, permits and company statements, with the power it estimates at each step. Steps after today are its projection.

0 MW50 MW100 MW150 MW200 MW250 MW300 MW202120222023202420252026Mar 4, 2020: 0 MWJan 23, 2023: 79 MWAug 3, 2024: 237 MWMay 4, 2026: 237 MW0 MW50 MW100 MW150 MW200 MW250 MW300 MW202120222023202420252026Mar 4, 2020: 0 MWJan 23, 2023: 79 MWAug 3, 2024: 237 MWMay 4, 2026: 237 MW
  1. Building 4 shell mostly complete, Building 5 steel framing is underway.

    237 MW for computing284 MW in all3 buildings running
  2. Land cleared for Building 4 and 5.

    237 MW for computing284 MW in all3 buildings running
  3. Building 3 looks operational.

    237 MW for computing (was 79 MW)284 MW in all3 buildings running
  4. Building 2 assumed operational due to vapor from cooling towers. Building 3 5/7 cooling towers installed.

    79 MW for computing95 MW in all1 building running
  5. Building 1 assumed operational due to vapor from cooling towers. Building 2 4/7 cooling towers installed. Building 3 roof complete coverage but unfinished.

    79 MW for computing95 MW in all1 building running
  6. Building 2 under construction. Building 3 begins construction.

    No power for computing yet
  7. Land clearing begins for Building 1 of expansion.

    No power for computing yet
The numbers

Power, chips, money and water.

Epoch AI's estimates as of May 4, 2026. IT power is what the computers draw; the total adds cooling and the rest of the building.

237 MWIT power, for the computersMay 4, 2026
284 MWtotal power, cooling included
237 MWthe most Epoch AI projects here
101,000computing power, counted as Nvidia H100 chips
$9.0 billioncapital cost so far: $6.2 billion for chips and computers, $2.8 billion for the buildings, power and land
$9.0 billioncapital cost, finished
$0.2 billiona year to run (power, staff, upkeep, taxes, water)
88,000 gallonsof water a day, Epoch AI's estimate (Aug 3, 2024)

Costs are Epoch AI's model, about $38 billion per gigawatt of IT power in 2025 dollars, not company figures. Running drawing power now, with no further growth in Epoch AI's projection.

Who's behind it

Owners, users and builders.

As Epoch AI records them. The owner is the company that owns the chips, which may not own the building. Who uses a site is often secret, so Epoch says how sure it is.

Owns the chips

Google

Uses it

Google DeepMind (possibly)

Part of

No wider project named

Investors

Google

Builders

Not named

Power from

Not named

What's inside

The chips, counted.

The AI chips at this site by Epoch AI's latest count. Most counts are estimates from the building's power; those marked disclosed come from the company.

ChipDesignerHow manySinceHow Epoch knows
TPU v5eGoogle261,166 est.Aug 3, 2024Cumulative through Buildings 2-3 (Q2 FY24 mix for new capacity; lagged one quarter from the operational date to account for purchase-to-operation delay). Chip type and quantity derived from Timeline power, TPU_Production power shares, and Parameters TDP.
TPU v5pGoogle70,453 est.Aug 3, 2024Buildings 2-3 (Q2 FY24 mix for new capacity; lagged one quarter from the operational date to account for purchase-to-operation delay). Chip type and quantity derived from Timeline power, TPU_Production power shares, and Parameters TDP.
TPU v4Google115,242 est.Jan 23, 2023Building 1 (Q1 FY23 mix for new capacity. The one-quarter purchase lag from the operational date points to Q4 FY22, which predates the TPU_Production table, so the earliest available quarter Q1 FY23 is used). Chip type and quantity derived from Timeline power, TPU_Production power shares, and Parameters TDP.
Sources

Where the facts come from.

The primary sources Epoch AI lists for this site: permits, filings, company posts and reporting. Epoch's own page and workings are last.

  1. Draft basis of air permit with details of cooling towersdrive.google.com
  2. 2025 Environmental Reportsustainability.google
  3. Google Papillion in Epoch AI's directoryepoch.ai
  4. Epoch AI's calculations for this siteGoogle Sheets

Data: Epoch AI, ‘AI data centers’, CC BY 4.0, read Nov 25, 2026. Page: Intelligence Progress, https://intelligenceprogress.com/data-centers/google-papillion