Being built · Bowling Green, Ohio

Meta Bowling Green

Meta Bowling Green is an AI data center in Bowling Green, Ohio, owned by Meta and used by Meta. It is being built; Epoch AI projects 422 MW for computing by Jan 2028.

  • 422 MWplanned by Jan 2028
Being built
How it grew

Watched from above.

Epoch AI's dated notes on this site, from satellite images, permits and company statements, with the power it estimates at each step. Steps after today are its projection.

0 MW100 MW200 MW300 MW400 MW500 MW2025202620272028Nov 1, 2024: 0 MWFeb 1, 2027: 86 MW (projected)Apr 1, 2027: 163 MW (projected)Jan 1, 2028: 422 MW (projected)0 MW100 MW200 MW300 MW400 MW500 MW2025202620272028Nov 1, 2024: 0 MWFeb 1, 2027: 86 MW (projected)Apr 1, 2027: 163 MW (projected)Jan 1, 2028: 422 MW (projected)
  1. Epoch AI's projection

    Buildings 3 and 4 are operational, based on their construction starting 11 months after Building 1. We assume they are powered by the 350 MW Apollo Power Generation Project.

    422 MW for computing (was 163 MW)570 MW in all4 buildings running
  2. Epoch AI's projection

    Building 2 is operational, based on construction progress as of Sep 2026 and foundations being laid around 2 months after Building 1.

    163 MW for computing (was 86 MW)220 MW in all2 buildings running
  3. Epoch AI's projection

    Building 1 is operational, based on a 5 month extrapolation from its roof completion date.

    86 MW for computing117 MW in all1 building running
  4. Roofs of Buildings 1 and 2 are more than halfway complete. All chillers for both buildings are visible. Construction on Buildings 3 and 4 has begun, with outlines laid. Construction on the Apollo Power Generation Project (a BTM power plant built just to the east of the data center) is in progress, with foundations poured and generation equipment being set in place.

    No power for computing yet
  5. Buildings 1 and 2 under construction. Building 1's chillers are almost all in place, while only half of Building 2's are. Optimus substation, which is the substation on site, and the expansion of Dowling Substation, an existing substation to the northeast of the data center, appear complete.

    No power for computing yet
  6. Land clearing begins.

    No power for computing yet
The numbers

Power, chips, money and water.

Epoch AI's estimates as of Jul 30, 2026. IT power is what the computers draw; the total adds cooling and the rest of the building.

None yetIT power, for the computersJul 30, 2026
None yettotal power, cooling included
422 MWIT power planned by Jan 2028
None yetcomputing power, counted as Nvidia H100 chips
–capital cost so far
$16 billioncapital cost once finished, by Jan 2028
–a year to run (power, staff, upkeep, taxes, water)
No estimateof water use from Epoch AI for this site

Costs are Epoch AI's model, about $38 billion per gigawatt of IT power in 2025 dollars, not company figures. Being built under construction, not yet drawing power for computing.

Who's behind it

Owners, users and builders.

As Epoch AI records them. The owner is the company that owns the chips, which may not own the building. Who uses a site is often secret, so Epoch says how sure it is.

Owns the chips

Meta

Uses it

Meta

Part of

No wider project named

Investors

Not named

Builders

Not named

Power from

Williams

Sources

Where the facts come from.

The primary sources Epoch AI lists for this site: permits, filings, company posts and reporting. Epoch's own page and workings are last.

  1. Meta letter to Middleton Townshipdrive.google.com
  2. Construction notice for new transmission lines to data center substationdrive.google.com
  3. Ohio Power Siting Board announcementarchive.ph
  4. Apollo Power Generation Project Letter of Notice Appendix A, with a project timelinedrive.google.com
  5. Meta Bowling Green in Epoch AI's directoryepoch.ai
  6. Epoch AI's calculations for this siteGoogle Sheets

Data: Epoch AI, ‘AI data centers’, CC BY 4.0, read Nov 25, 2026. Page: Intelligence Progress, https://intelligenceprogress.com/data-centers/meta-bowling-green