Running and growing · Omaha, Nebraska

Google Omaha

Google Omaha is an AI data center in Omaha, Nebraska, owned by Google and used by Google DeepMind (possibly). Epoch AI estimates it draws 237 MW for computing, rising to 395 MW by Jul 2028.

  • 237 MWfor computing now, #18 of the 96 Epoch AI tracks
  • 395 MWplanned by Jul 2028
  • $9.0 billionbuilt so far, Epoch AI's estimate in 2025 dollars
237 MW now
How it grew

Watched from above.

Epoch AI's dated notes on this site, from satellite images, permits and company statements, with the power it estimates at each step. Steps after today are its projection.

0 MW100 MW200 MW300 MW400 MW500 MW2022202320242025202620272028Nov 25, 2021: 0 MWApr 8, 2024: 79 MWNov 19, 2024: 158 MWJun 30, 2026: 237 MWJan 23, 2028: 316 MW (projected)Jul 23, 2028: 395 MW (projected)0 MW100 MW200 MW300 MW400 MW500 MW2022202320242025202620272028Nov 25, 2021: 0 MWApr 8, 2024: 79 MWNov 19, 2024: 158 MWJun 30, 2026: 237 MWJan 23, 2028: 316 MW (projected)Jul 23, 2028: 395 MW (projected)
  1. Epoch AI's projection

    Building 5 is operational. We expect a 5th building because there's enough land cleared for one. We assume a roughly 6-month delay after Building 4.

    395 MW for computing (was 316 MW)474 MW in all5 buildings running
  2. Epoch AI's projection

    Building 4 is operational. Expect a 4th building because there's enough land cleared for it. Assuming the foundation starts at the end of May 2026 and it takes a similar time to Building 3 from foundation to operational (1 year 8 months).

    316 MW for computing (was 237 MW)379 MW in all4 buildings running
  3. Building 3 is operational (estimate). Based on there being minimal construction work as of May 15.

    237 MW for computing (was 158 MW)284 MW in all3 buildings running
  4. Building 3 appears almost complete, with only minimal construction work and equipment remaining. The cooling towers are spaced apart in an unusual way, but there's no obvious sign that more will be installed before operation. Buildings 4 and 5 haven't started construction yet, the cleared land is still empty.

    158 MW for computing189 MW in all2 buildings running
  5. Building 3 has all backup generators in place but they are still being installed. Two cooling towers have fans on them, with more underway. To the south of Building 3, more land has been cleared and there's a new carpark. This suggests another building will soon start construction.

    158 MW for computing189 MW in all2 buildings running
  6. Confident that Building 2 is operational

    158 MW for computing189 MW in all2 buildings running
  7. Confirmation that there's no obvious construction happening for Building 2. Building 3 roof started.

    158 MW for computing189 MW in all2 buildings running
  8. Building 2 is operational, based on it being 8 months since the roof was complete, and surrounding infrastructure looks just completed (finishing the cooling towers).

    158 MW for computing (was 79 MW)189 MW in all2 buildings running
  9. Building 2 has 3 cooling towers installed.

    79 MW for computing95 MW in all1 building running
  10. Building 1 operational, based on it being 6 months after roof was complete, infrastructure looked complete for 5 months.

    79 MW for computing95 MW in all1 building running
  11. Land clearing begins.

    No power for computing yet
The numbers

Power, chips, money and water.

Epoch AI's estimates as of Jun 30, 2026. IT power is what the computers draw; the total adds cooling and the rest of the building.

237 MWIT power, for the computersJun 30, 2026
284 MWtotal power, cooling included
395 MWIT power planned by Jul 2028
199,000computing power, counted as Nvidia H100 chips
$9.0 billioncapital cost so far: $6.2 billion for chips and computers, $2.8 billion for the buildings, power and land
$15 billioncapital cost once finished, by Jul 2028
$0.2 billiona year to run (power, staff, upkeep, taxes, water)
88,000 gallonsof water a day, Epoch AI's estimate (Jul 29, 2024)

Costs are Epoch AI's model, about $38 billion per gigawatt of IT power in 2025 dollars, not company figures. Running and growing drawing power now, and Epoch AI projects more to come.

Who's behind it

Owners, users and builders.

As Epoch AI records them. The owner is the company that owns the chips, which may not own the building. Who uses a site is often secret, so Epoch says how sure it is.

Owns the chips

Google

Uses it

Google DeepMind (possibly)

Part of

No wider project named

Investors

Not named

Builders

Not named

Power from

Not named

What's inside

The chips, counted.

The AI chips at this site by Epoch AI's latest count. Most counts are estimates from the building's power; those marked disclosed come from the company.

ChipDesignerHow manySinceHow Epoch knows
TPU v7Google41,901 est.Jun 30, 2026Building 3 (Q2 FY26 mix for new capacity; lagged one quarter from the operational date to account for purchase-to-operation delay). Buildings 4 and 5 are omitted because their lagged quarters (Q4 FY27, Q2 FY28) are extrapolated with no per-version mix. Chip type and quantity derived from Timeline power, TPU_Production power shares, and Parameters TDP.
TPU v5eGoogle263,957 est.Nov 19, 2024Cumulative through Building 2 (Q4 FY24 mix for new capacity; lagged one quarter from the operational date to account for purchase-to-operation delay). Chip type and quantity derived from Timeline power, TPU_Production power shares, and Parameters TDP.
TPU v6eGoogle28,846 est.Jun 30, 2026Cumulative through Building 3 (Q2 FY26 mix for new capacity; lagged one quarter from the operational date to account for purchase-to-operation delay). Chip type and quantity derived from Timeline power, TPU_Production power shares, and Parameters TDP.
TPU v5pGoogle47,061 est.Nov 19, 2024Cumulative through Building 2 (Q4 FY24 mix for new capacity; lagged one quarter from the operational date to account for purchase-to-operation delay). Chip type and quantity derived from Timeline power, TPU_Production power shares, and Parameters TDP.
Sources

Where the facts come from.

The primary sources Epoch AI lists for this site: permits, filings, company posts and reporting. Epoch's own page and workings are last.

  1. Draft basis of air permit with details of cooling towersdrive.google.com
  2. 2025 Environmental Reportsustainability.google
  3. Google Omaha in Epoch AI's directoryepoch.ai
  4. Epoch AI's calculations for this siteGoogle Sheets

Data: Epoch AI, ‘AI data centers’, CC BY 4.0, read Nov 25, 2026. Page: Intelligence Progress, https://intelligenceprogress.com/data-centers/google-omaha