Running and growing · San Antonio, Texas

Vantage TX1

Vantage TX1 is an AI data center in San Antonio, Texas. Epoch AI estimates it draws 32 MW for computing, rising to 128 MW by Aug 2027.

  • 32 MWfor computing now, #73 of the 96 Epoch AI tracks
  • 128 MWplanned by Aug 2027
  • $1.2 billionbuilt so far, Epoch AI's estimate in 2025 dollars
32 MW now
How it grew

Watched from above.

Epoch AI's dated notes on this site, from satellite images, permits and company statements, with the power it estimates at each step. Steps after today are its projection.

0 MW50 MW100 MW150 MW2024202520262027Dec 15, 2023: 0 MWFeb 15, 2026: 32 MWAug 31, 2027: 128 MW (projected)0 MW50 MW100 MW150 MW2024202520262027Dec 15, 2023: 0 MWFeb 15, 2026: 32 MWAug 31, 2027: 128 MW (projected)
  1. Epoch AI's projection

    Estimated construction completion date of Building 2. Construction Project Filing

    128 MW for computing (was 32 MW)179 MW in all2 buildings running
  2. Building 1 operational; Roads around Building 1 complete, all cooling and side generator equipment construction has since finished as well. Although this is still earlier than the completion date reported on TDLR, based on the appearance, we believe it is operational. Reported IT power of 32 MW. Source

    32 MW for computing45 MW in all1 building running
  3. Land clearing begins for both Building 1 & Building 2

    No power for computing yet
The numbers

Power, chips, money and water.

Epoch AI's estimates as of Feb 15, 2026. IT power is what the computers draw; the total adds cooling and the rest of the building.

32 MWIT power, for the computersFeb 15, 2026
45 MWtotal power, cooling included
128 MWIT power planned by Aug 2027
39,000computing power, counted as Nvidia H100 chips
$1.2 billioncapital cost so far: $0.8 billion for chips and computers, $0.4 billion for the buildings, power and land
$4.8 billioncapital cost once finished, by Aug 2027
$0.0 billiona year to run (power, staff, upkeep, taxes, water)
No estimateof water use from Epoch AI for this site

Costs are Epoch AI's model, about $38 billion per gigawatt of IT power in 2025 dollars, not company figures. Running and growing drawing power now, and Epoch AI projects more to come.

Who's behind it

Owners, users and builders.

As Epoch AI records them. The owner is the company that owns the chips, which may not own the building. Who uses a site is often secret, so Epoch says how sure it is.

Owns the chips

Not named by Epoch AI

Uses it

Not known

Part of

No wider project named

Investors

Not named

Builders

Not named

Power from

Not named

What's inside

The chips, counted.

The AI chips at this site by Epoch AI's latest count. Most counts are estimates from the building's power; those marked disclosed come from the company.

ChipDesignerHow manySinceHow Epoch knows
B200Nvidia15,311 est.Feb 15, 2026GB200 NVL72 assumed. Building 1 reported IT power of 32 MW (TDLR). Count = IT power / (IT overhead × server power) × 72.
Sources

Where the facts come from.

The primary sources Epoch AI lists for this site: permits, filings, company posts and reporting. Epoch's own page and workings are last.

  1. Construction Permitting for TX11tdlr.texas.gov
  2. Construction Permitting for TX12tdlr.texas.gov
  3. Air quality permitting that references TX13drive.google.com
  4. Vantage TX1 in Epoch AI's directoryepoch.ai
  5. Epoch AI's calculations for this siteGoogle Sheets

Data: Epoch AI, ‘AI data centers’, CC BY 4.0, read Nov 25, 2026. Page: Intelligence Progress, https://intelligenceprogress.com/data-centers/vantage-tx1