Google Storey County

Google Storey County is an AI data center in Clark, Nevada, owned by Google and used by Google DeepMind (possibly). Epoch AI estimates it draws 161 MW for computing, rising to 300 MW by Jun 2027.

  • 161 MWfor computing now, #36 of the 96 Epoch AI tracks
  • 300 MWplanned by Jun 2027
  • $6.1 billionbuilt so far, Epoch AI's estimate in 2025 dollars
161 MW now
How it grew

Watched from above.

Epoch AI's dated notes on this site, from satellite images, permits and company statements, with the power it estimates at each step. Steps after today are its projection.

0 MW100 MW200 MW300 MW400 MW20202021202220232024202520262027Mar 18, 2019: 0 MWAug 30, 2023: 81 MWJun 30, 2025: 161 MWJun 30, 2027: 300 MW (projected)0 MW100 MW200 MW300 MW400 MW20202021202220232024202520262027Mar 18, 2019: 0 MWAug 30, 2023: 81 MWJun 30, 2025: 161 MWJun 30, 2027: 300 MW (projected)
  1. Epoch AI's projection

    Building 3 is estimated to be operational. We estimate the operational date by analogy to the time that Building 1 took to go from a foundation to being operational. The power capacity is based on the number of generators reported in an air quality permit application (p.92-93). The dry cooler array is more than double the size of the Building 1 array, which suggests an even larger power capacity than we estimate, but we believe the generator-based estimate is more reliable here.

    300 MW for computing (was 161 MW)389 MW in all3 buildings running
  2. Building 3 has a partially complete shell, electrical and mechanical equipment. Building 4 foundation is underway.

    161 MW for computing214 MW in all2 buildings running
  3. Building 3 foundation is underway. Building 2 exterior looks totally clean/landscaped.

    161 MW for computing214 MW in all2 buildings running
  4. Building 2 is operational. Based on a Google Earth image showing complete building shell, mechanical equipment and generators, plus cars parked at the front.

    161 MW for computing (was 81 MW)214 MW in all2 buildings running
  5. Building 2 now has generators in place, but there is still a crane and construction work present.

    81 MW for computing107 MW in all1 building running
  6. Building 1, which was first operational in 2021, has increased power capacity by about 75%. This is based on the expansion of the dry cooling array from 4 to 7 columns (seen on Google Earth). Its backup generators also grew from 18 to 33, an 83% increase. Around this time (2023 Q3) the quarterly PUE of the campus is 1.24, down from the initial 1.29 in 2022 Q3. Since no other buildings have been added, these changes indicate an increase in power density, which may entail a new generation of hardware getting installed.

    81 MW for computing107 MW in all1 building running
  7. Land clearing begins.

    No power for computing yet
The numbers

Power, chips, money and water.

Epoch AI's estimates as of Apr 13, 2026. IT power is what the computers draw; the total adds cooling and the rest of the building.

161 MWIT power, for the computersApr 13, 2026
214 MWtotal power, cooling included
300 MWIT power planned by Jun 2027
134,000computing power, counted as Nvidia H100 chips
$6.1 billioncapital cost so far: $4.2 billion for chips and computers, $1.9 billion for the buildings, power and land
$11 billioncapital cost once finished, by Jun 2027
$0.1 billiona year to run (power, staff, upkeep, taxes, water)
500 gallonsof water a day, Epoch AI's estimate (Aug 30, 2023)

Costs are Epoch AI's model, about $38 billion per gigawatt of IT power in 2025 dollars, not company figures. Running and growing drawing power now, and Epoch AI projects more to come.

Who's behind it

Owners, users and builders.

As Epoch AI records them. The owner is the company that owns the chips, which may not own the building. Who uses a site is often secret, so Epoch says how sure it is.

Owns the chips

Google

Uses it

Google DeepMind (possibly)

Part of

No wider project named

Investors

Not named

Builders

Not named

Power from

Not named

What's inside

The chips, counted.

The AI chips at this site by Epoch AI's latest count. Most counts are estimates from the building's power; those marked disclosed come from the company.

ChipDesignerHow manySinceHow Epoch knows
TPU v6eGoogle98,179 est.Jun 30, 2025Building 2 (Q2 FY25 mix for new capacity: v6e + v5p; lagged one quarter from the operational date to account for purchase-to-operation delay). Delta from Building 1 IT power. Chip type and quantity derived from Timeline power, TPU_Production power shares, and Parameters TDP.
TPU v5eGoogle153,165 est.Aug 30, 2023Building 1 expansion (Q3 FY23 mix for new capacity: v5e + v4; lagged one quarter from the operational date to account for purchase-to-operation delay), assuming it was fully retrofitted. Chip type and quantity derived from Timeline power, TPU_Production power shares, and Parameters TDP.
TPU v5pGoogle16,521 est.Jun 30, 2025Building 2 (Q2 FY25 mix for new capacity: v6e + v5p; lagged one quarter from the operational date to account for purchase-to-operation delay). Delta from Building 1 IT power. Chip type and quantity derived from Timeline power, TPU_Production power shares, and Parameters TDP.
TPU v4Google34,609 est.Aug 30, 2023Building 1 expansion (Q3 FY23 mix for new capacity: v5e + v4; lagged one quarter from the operational date to account for purchase-to-operation delay), assuming it was fully retrofitted. Chip type and quantity derived from Timeline power, TPU_Production power shares, and Parameters TDP.
Sources

Where the facts come from.

The primary sources Epoch AI lists for this site: permits, filings, company posts and reporting. Epoch's own page and workings are last.

  1. Air quality permit application listing emergency generators and a small "R&D" fuel cell plantndep-onbase.nv.gov
  2. Aterioaterio.io
  3. Google data center pagedatacenters.google
  4. Google Storey County in Epoch AI's directoryepoch.ai
  5. Epoch AI's calculations for this siteGoogle Sheets

Data: Epoch AI, ‘AI data centers’, CC BY 4.0, read Nov 25, 2026. Page: Intelligence Progress, https://intelligenceprogress.com/data-centers/google-storey-county