Google Lincoln

Google Lincoln is an AI data center in Lincoln, Nebraska, owned by Google. Epoch AI estimates it draws 141 MW for computing, rising to 283 MW by Oct 2027.

  • 141 MWfor computing now, #43 of the 96 Epoch AI tracks
  • 283 MWplanned by Oct 2027
  • $5.3 billionbuilt so far, Epoch AI's estimate in 2025 dollars
141 MW now
How it grew

Watched from above.

Epoch AI's dated notes on this site, from satellite images, permits and company statements, with the power it estimates at each step. Steps after today are its projection.

0 MW100 MW200 MW300 MW400 MW2024202520262027Jun 1, 2023: 0 MWMay 12, 2026: 141 MWOct 1, 2027: 283 MW (projected)0 MW100 MW200 MW300 MW400 MW2024202520262027Jun 1, 2023: 0 MWMay 12, 2026: 141 MWOct 1, 2027: 283 MW (projected)
  1. Epoch AI's projection

    Building 2 operational. Estimated based on the construction timeline for Building 1, specifically the time to operational since the roof was complete and the time to operational since the foundation work began.

    283 MW for computing (was 141 MW)339 MW in all2 buildings running
  2. Building 1 operational. This is based on the fact that is no more visible equipment or construction around the building, and based on previous imagery and when construction started on the last pieces of equipment (fans). Building 2's roof is complete, with generator construction more than halfway complete and cooling construction beginning. Electrical equipment on the side of Building 2 is also around halfway complete.

    141 MW for computing170 MW in all1 building running
  3. Building 1 looks mostly complete: the large items like generators and substation are done. It is just missing 2 more cooling towers (4 fans). They just seem to be paving and setting up the secondary equipment so it is probably a few months away from operation. Building 2 foundation has been laid.

    No power for computing yet
  4. Land clearing begins.

    No power for computing yet
The numbers

Power, chips, money and water.

Epoch AI's estimates as of May 12, 2026. IT power is what the computers draw; the total adds cooling and the rest of the building.

141 MWIT power, for the computersMay 12, 2026
170 MWtotal power, cooling included
283 MWIT power planned by Oct 2027
198,000computing power, counted as Nvidia H100 chips
$5.3 billioncapital cost so far: $3.7 billion for chips and computers, $1.7 billion for the buildings, power and land
$11 billioncapital cost once finished, by Oct 2027
$0.1 billiona year to run (power, staff, upkeep, taxes, water)
No estimateof water use from Epoch AI for this site

Costs are Epoch AI's model, about $38 billion per gigawatt of IT power in 2025 dollars, not company figures. Running and growing drawing power now, and Epoch AI projects more to come.

Who's behind it

Owners, users and builders.

As Epoch AI records them. The owner is the company that owns the chips, which may not own the building. Who uses a site is often secret, so Epoch says how sure it is.

Owns the chips

Google

Uses it

Not known

Part of

No wider project named

Investors

Not named

Builders

Not named

Power from

Not named

What's inside

The chips, counted.

The AI chips at this site by Epoch AI's latest count. Most counts are estimates from the building's power; those marked disclosed come from the company.

ChipDesignerHow manySinceHow Epoch knows
TPU v7Google75,060 est.May 12, 2026First operational capacity (Q2 FY26 mix for new capacity; lagged one quarter from the operational date to account for purchase-to-operation delay). Chip type and quantity derived from Timeline power, TPU_Production power shares, and Parameters TDP.
TPU v6eGoogle24,067 est.May 12, 2026First operational capacity (Q2 FY26 mix for new capacity; lagged one quarter from the operational date to account for purchase-to-operation delay). Chip type and quantity derived from Timeline power, TPU_Production power shares, and Parameters TDP.
Sources

Where the facts come from.

The primary sources Epoch AI lists for this site: permits, filings, company posts and reporting. Epoch's own page and workings are last.

  1. Army corps land use application with a useful construction plan diagram, split across 7 phasesupload.wikimedia.org
  2. DCD article on the start of site constructiondatacenterdynamics.com
  3. Rezoning approval, stating 75 ft building heightlnklan.granicus.com
  4. Google Lincoln in Epoch AI's directoryepoch.ai
  5. Epoch AI's calculations for this siteGoogle Sheets

Data: Epoch AI, ‘AI data centers’, CC BY 4.0, read Nov 25, 2026. Page: Intelligence Progress, https://intelligenceprogress.com/data-centers/google-lincoln