Wednesday, November 25, 2026 · Edition updated 6:00 AM ETWED, NOV 25 editionNext edition in Next in --:--:--
Intelligence Progress
Being built · Santa Teresa, New Mexico

OpenAI Stargate New Mexico

OpenAI Stargate New Mexico is an AI data center in Santa Teresa, New Mexico, owned by Oracle and used by OpenAI. It is being built; Epoch AI projects 1.75 GW for computing by Dec 2028.

  • 1.75 GWplanned by Dec 2028
Being built
How it grew

Watched from above.

Epoch AI's dated notes on this site, from satellite images, permits and company statements, with the power it estimates at each step. Steps after today are its projection.

0 MW500 MW1 GW1.5 GW2 GW202620272028Oct 1, 2025: 0 MWDec 31, 2028: 1.75 GW (projected)0 MW500 MW1 GW1.5 GW2 GW202620272028Oct 1, 2025: 0 MWDec 31, 2028: 1.75 GW (projected)
  1. Epoch AI's projection

    Estimated construction completion date of the site. Stormwater permitting says 2027-12-31 for stormwater construction to finish, but for a more conservative estimate and based on the current state of the site, we pushed the final date by a year beyond it. Source, page 2

    1.75 GW for computing2.45 GW in all4 buildings running
  2. Construction has advanced significantly since February 2026. We observe extensive earthworks and multiple graded building pads across the campus, with structural work underway on the main data center buildings. A large solar array and water storage basins are visible on site, and two cleared areas on the western side of the campus, likely for on-site power generation. No buildings appear operational yet (no completed roofs or signs of active cooling), consistent with the projected 2028 completion.

    No power for computing yet
  3. Land clearing continues, foundation construction begins 2 of the main buildings (Building B & D). Construction also beginning on modular chiller plants.

    No power for computing yet
  4. Construction and land clearing begins

    No power for computing yet
The numbers

Power, chips, money and water.

Epoch AI's estimates as of Jun 22, 2026. IT power is what the computers draw; the total adds cooling and the rest of the building.

None yetIT power, for the computersJun 22, 2026
None yettotal power, cooling included
1.75 GWIT power planned by Dec 2028
None yetcomputing power, counted as Nvidia H100 chips
–capital cost so far
$66 billioncapital cost once finished, by Dec 2028
–a year to run (power, staff, upkeep, taxes, water)
No estimateof water use from Epoch AI for this site

Costs are Epoch AI's model, about $38 billion per gigawatt of IT power in 2025 dollars, not company figures. Being built under construction, not yet drawing power for computing.

Who's behind it

Owners, users and builders.

As Epoch AI records them. The owner is the company that owns the chips, which may not own the building. Who uses a site is often secret, so Epoch says how sure it is.

Owns the chips

Oracle

Uses it

OpenAI

Part of

Stargate

Investors

Not named

Builders

Not named

Power from

Bloom Energy

Sources

Where the facts come from.

The primary sources Epoch AI lists for this site: permits, filings, company posts and reporting. Epoch's own page and workings are last.

  1. Project Jupiter Websiteprojectjupitertogether.com
  2. Stormwater Permittingdrive.google.com
  3. Oracle, BorderPlex and Bloom Energy to power Project Jupiter with fuel cell technology (Apr 27, 2026)oracle.com
  4. OpenAI Stargate New Mexico in Epoch AI's directoryepoch.ai
  5. Epoch AI's calculations for this siteGoogle Sheets

Data: Epoch AI, ‘AI data centers’, CC BY 4.0, read Nov 25, 2026. Page: Intelligence Progress, https://intelligenceprogress.com/data-centers/openai-stargate-new-mexico