Epoch AI's dated notes on this site, from satellite images, permits and company statements, with the power it estimates at each step. Steps after today are its projection.
The three buildings look unchanged since March.
72 MW for computing94 MW in all3 buildings runningBuilding 3 is operational. Based on it looking complete as of March, and DayOne posting a video of the facility on this date. In one shot of the video, fan movement is visible for all buildings, suggesting they are all operational.
72 MW for computing (was 33 MW)94 MW in all3 buildings runningBuilding 3 looks complete including building shell, chillers and backup generators.
33 MW for computing43 MW in all2 buildings runningBuilding 3 has cooling towers beginning to be installed.
33 MW for computing43 MW in all2 buildings runningBuilding 3 shell is partly built. Building 1 and 2 look complete.
33 MW for computing43 MW in all2 buildings runningBuilding 1 and 2 are operational. Based on Oracle announcing the Indonesia North (Batam) region is available, and both buildings looking complete soon after, in June.
33 MW for computing43 MW in all2 buildings runningLand clearing begins.
No power for computing yet
Power, chips, money and water.
Epoch AI's estimates as of May 6, 2026. IT power is what the computers draw; the total adds cooling and the rest of the building.
Costs are Epoch AI's model, about $38 billion per gigawatt of IT power in 2025 dollars, not company figures. Running drawing power now, with no further growth in Epoch AI's projection.
Owners, users and builders.
As Epoch AI records them. The owner is the company that owns the chips, which may not own the building. Who uses a site is often secret, so Epoch says how sure it is.
The chips, counted.
The AI chips at this site by Epoch AI's latest count. Most counts are estimates from the building's power; those marked disclosed come from the company.
| Chip | Designer | How many | Since | How Epoch knows |
|---|---|---|---|---|
| B300 | Nvidia | 17,397 est. | Apr 17, 2026 | Estimated from power capacity. DayOne partners with NVIDIA, and these are the best wide-sold chips available at the time. In a LinkedIn post DayOne said it "signed a contract with a leading global tech company in Q3 [2024] for 34 MW committed and 38 MW reserved capacity at our Batam campus." A partnership with Oracle specifically was later reported, and 38 MW corresponds to the third data center building. We assume Oracle has used their reservation by this point, but this is not confirmed. |
| B200 | Nvidia | 15,999 est. | May 15, 2025 | Estimated from power capacity. DayOne partners with NVIDIA, and these are the best wide-sold chips available at the time. In a LinkedIn post DayOne said it "signed a contract with a leading global tech company in Q3 [2024] for 34 MW committed and 38 MW reserved capacity at our Batam campus." A partnership with Oracle specifically was later reported, and 34 MW corresponds to the first two data center buildings. |
Batam, Riau Islands, Indonesia
Epoch AI gives no street address for this site.
More of Oracle's
Where the facts come from.
The primary sources Epoch AI lists for this site: permits, filings, company posts and reporting. Epoch's own page and workings are last.
- DayOne discloses a partnership with "leading global tech company" at their Batam campuslinkedin.com
- Oracle announces their Batam cloud compute regiondocs.oracle.com
- Oracle is later reported to be leasing DayOne data centers in Indonesiadatacenterdynamics.com
- DayOne video stating 72 MW of IT power and NVIDIA partnership, and showing cooling tower fan movementlinkedin.com
- Tencent deal with Oracle for 100,000 AI chips in Southeast Asian data centersft.com
- Oracle Batam in Epoch AI's directoryepoch.ai
- Epoch AI's calculations for this siteGoogle Sheets
Data: Epoch AI, ‘AI data centers’, CC BY 4.0, read Nov 25, 2026. Page: Intelligence Progress, https://intelligenceprogress.com/data-centers/oracle-batam