Its power over time
896 MW now, 5.94 GW planned.
Power for computing at the sites where Oracle owns the chips, month by month. After today it is Epoch AI's projection. Built so far: about $34 billion, by Epoch's cost model.
- Oracle
- Projected by Epoch AI
The numbers, year by year
| End of | Oracle | All |
|---|---|---|
| 2025 | 239 MW | 239 MW |
| 2026* | 896 MW | 896 MW |
| 2027* | 1.3 GW | 1.3 GW |
| 2028* | 5.9 GW | 5.9 GW |
| 2029* | 5.9 GW | 5.9 GW |
| Jan 2030* | 5.9 GW | 5.9 GW |
IT power. * Epoch AI's projection.
Owned · 6
Where it owns the chips.
Largest first, by power drawn now. Each opens the site's full record.
- RunningOpenAI Stargate AbileneAbilene, Texas · Oracle824 MW now
- RunningOracle BatamBatam, Riau Islands, Indonesia · Oracle (likely)72 MW now
- Being builtOpenAI Stargate New MexicoSanta Teresa, New Mexico · OracleNot drawing power yet1.75 GW by Dec 2028
- Being builtOpenAI Stargate ShackelfordAbilene, Texas · OracleNot drawing power yet1.40 GW by Nov 2028
- Being builtOpenAI Stargate MichiganBenton, Michigan · OracleNot drawing power yet988 MW by Dec 2028
- Being builtOpenAI Stargate WisconsinPort Washington, Wisconsin · OracleNot drawing power yet902 MW by Dec 2028
Where
In 5 places.
From Epoch AI's AI data centers data (CC BY 4.0), read Nov 25, 2026. Owner means the company that owns the chips; Epoch notes it may differ from who owns or runs the building. Next change Epoch projects: OpenAI Stargate Shackelford, 140 MW by Aug 15, 2027.