Meta Gallatin

Meta Gallatin is an AI data center in Gallatin, Tennessee, owned by Meta and used by Meta. Epoch AI estimates it draws 87 MW for computing.

  • 87 MWfor computing now, #55 of the 96 Epoch AI tracks
  • $3.3 billionbuilt so far, Epoch AI's estimate in 2025 dollars
87 MW now
How it grew

Watched from above.

Epoch AI's dated notes on this site, from satellite images, permits and company statements, with the power it estimates at each step. Steps after today are its projection.

0 MW20 MW40 MW60 MW80 MW100 MW202420252026Sep 11, 2023: 0 MWAug 24, 2026: 87 MW0 MW20 MW40 MW60 MW80 MW100 MW202420252026Sep 11, 2023: 0 MWAug 24, 2026: 87 MW
  1. Building 1 is operational, based on a lack of construction activity around the shell and cooling equipment, and about 6 months passing after structural completion.

    87 MW for computing114 MW in all1 building running
  2. Building 1 shell and cooling looks complete, but construction equipment is still seen around cooling and building.

    No power for computing yet
  3. Land clearing starts for Building 1.

    No power for computing yet
The numbers

Power, chips, money and water.

Epoch AI's estimates as of Aug 24, 2026. IT power is what the computers draw; the total adds cooling and the rest of the building.

87 MWIT power, for the computersAug 24, 2026
114 MWtotal power, cooling included
87 MWthe most Epoch AI projects here
100,000computing power, counted as Nvidia H100 chips
$3.3 billioncapital cost so far: $2.3 billion for chips and computers, $1.0 billion for the buildings, power and land
$3.3 billioncapital cost, finished
$0.1 billiona year to run (power, staff, upkeep, taxes, water)
No estimateof water use from Epoch AI for this site

Costs are Epoch AI's model, about $38 billion per gigawatt of IT power in 2025 dollars, not company figures. Running drawing power now, with no further growth in Epoch AI's projection.

Who's behind it

Owners, users and builders.

As Epoch AI records them. The owner is the company that owns the chips, which may not own the building. Who uses a site is often secret, so Epoch says how sure it is.

Owns the chips

Meta

Uses it

Meta

Part of

No wider project named

Investors

Not named

Builders

Not named

Power from

Not named

What's inside

The chips, counted.

The AI chips at this site by Epoch AI's latest count. Most counts are estimates from the building's power; those marked disclosed come from the company.

ChipDesignerHow manySinceHow Epoch knows
B300Nvidia39,453 est.Aug 24, 2026GB300 NVL72 assumed from commissioning timeline and estimates from https://epoch.ai/data/ai-chip-owners . Count = Total IT power / IT overhead / server power x 72.
Sources

Where the facts come from.

The primary sources Epoch AI lists for this site: permits, filings, company posts and reporting. Epoch's own page and workings are last.

  1. Meta fact sheetdatacenters.atmeta.com
  2. Campus extension announcementgallatingetsit.com
  3. Meta Gallatin in Epoch AI's directoryepoch.ai
  4. Epoch AI's calculations for this siteGoogle Sheets

Data: Epoch AI, ‘AI data centers’, CC BY 4.0, read Nov 25, 2026. Page: Intelligence Progress, https://intelligenceprogress.com/data-centers/meta-gallatin