Wednesday, November 25, 2026 · Edition updated 6:00 AM ETWED, NOV 25 editionNext edition in Next in --:--:--
Intelligence Progress
Running · Memphis, Tennessee

Colossus 1

Colossus 1 is an AI data center in Memphis, Tennessee, owned by SpaceXAI and used by Anthropic. Epoch AI estimates it draws 340 MW for computing.

  • 340 MWfor computing now, #10 of the 96 Epoch AI tracks
  • $13 billionbuilt so far, Epoch AI's estimate in 2025 dollars
340 MW now
How it grew

Watched from above.

Epoch AI's dated notes on this site, from satellite images, permits and company statements, with the power it estimates at each step. Steps after today are its projection.

0 MW100 MW200 MW300 MW400 MW20252026Apr 24, 2024: 0 MWAug 11, 2024: 35 MWSep 2, 2024: 139 MWFeb 17, 2025: 278 MWJul 22, 2025: 340 MWSep 17, 2025: 268 MWNov 7, 2025: 340 MWJun 15, 2026: 340 MW0 MW100 MW200 MW300 MW400 MW20252026Apr 24, 2024: 0 MWAug 11, 2024: 35 MWSep 2, 2024: 139 MWFeb 17, 2025: 278 MWJul 22, 2025: 340 MWSep 17, 2025: 268 MWNov 7, 2025: 340 MWJun 15, 2026: 340 MW
  1. No major changes to the data center since February. Solar panels have been placed next to the facility.

    340 MW for computing425 MW in all1 building running
  2. We assume that Anthropic has started using Colossus 1 now, since the announcement said they would get access to 300 MW "within the month" of May.

    340 MW for computing425 MW in all1 building running
  3. Anthropic announces their agreement with SpaceX to use all of the compute capacity at Colossus 1. They state that this corresponds to more than 300 MW (presumably IT power) and over 220,000 GPUs. This is slightly different to previous reports adding up to 230,000 GPUs, but still roughly consistent with our estimates.

    340 MW for computing425 MW in all1 building running
  4. All air-cooled chillers have been disconnected and/or removed from the site, leaving only the cooling towers for cooling. The third substation looks complete, with red cables connected to the building.

    340 MW for computing425 MW in all1 building running
  5. Third substation was expected to power the building in Fall.

    340 MW for computing (was 268 MW)442 MW in all1 building running
  6. There is still construction visible in the third substation yard and next to the new cooling towers.

    268 MW for computing348 MW in all1 building running
  7. Third substation looks completed, but it doesn't appear to be connected to the building yet. Some air-cooled chillers removed, while large cooling towers are added.

    268 MW for computing (was 340 MW)348 MW in all1 building running
  8. 30k B200s added (in GB200 configuration).

    340 MW for computing (was 278 MW)442 MW in all1 building running
  9. Second substation almost connected (red cables)

    278 MW for computing361 MW in all1 building running
  10. 150k H100s and 50k H200s online. This is roughly when Musk said, plus on this date they reported "running jobs with 150K+ GPUs".

    278 MW for computing (was 139 MW)361 MW in all1 building running
  11. 100k H100s online.

    139 MW for computing (was 35 MW)181 MW in all1 building running
  12. First significant/useful training workload on 25k H100s.

    35 MW for computing45 MW in all1 building running
  13. Construction starts with a road added on site, retrofitting a former Electrolux building.

    No power for computing yet
The numbers

Power, chips, money and water.

Epoch AI's estimates as of Jun 15, 2026. IT power is what the computers draw; the total adds cooling and the rest of the building.

340 MWIT power, for the computersJun 15, 2026
425 MWtotal power, cooling included
340 MWthe most Epoch AI projects here
276,000computing power, counted as Nvidia H100 chips
$13 billioncapital cost so far: $8.9 billion for chips and computers, $4.0 billion for the buildings, power and land
$13 billioncapital cost, finished
$0.3 billiona year to run (power, staff, upkeep, taxes, water)
No estimateof water use from Epoch AI for this site

Costs are Epoch AI's model, about $38 billion per gigawatt of IT power in 2025 dollars, not company figures. Running drawing power now, with no further growth in Epoch AI's projection.

Who's behind it

Owners, users and builders.

As Epoch AI records them. The owner is the company that owns the chips, which may not own the building. Who uses a site is often secret, so Epoch says how sure it is.

Owns the chips

SpaceXAI

Uses it

Anthropic

Part of

No wider project named

Investors

Not named

Builders

Not named

Power from

MLGW

What's inside

The chips, counted.

The AI chips at this site by Epoch AI's latest count. Most counts are estimates from the building's power; those marked disclosed come from the company.

ChipDesignerHow manySinceHow Epoch knows
H100Nvidia150,000 disclosedJun 1, 2026https://www.anthropic.com/news/higher-limits-spacex. As of June, because they said "within the month [of May]"
B200Nvidia30,000 disclosedJun 1, 2026https://www.anthropic.com/news/higher-limits-spacex. As of June, because they said "within the month [of May]"
H200Nvidia50,000 disclosedJun 1, 2026https://www.anthropic.com/news/higher-limits-spacex. As of June, because they said "within the month [of May]"
Sources

Where the facts come from.

The primary sources Epoch AI lists for this site: permits, filings, company posts and reporting. Epoch's own page and workings are last.

  1. May 2025 Electricity Provider Disclosuredrive.google.com
  2. July 2025 Permit for Gas Turbinesscribd.com
  3. Southern Environmental Law Center Gas Permit Appeal, with additional satellite imagescdn.arstechnica.net
  4. Disclosure on X (formerly Twitter) by Elon Musk of the breakdown of GPUsarchive.is
  5. Anthropic announcementanthropic.com
  6. Colossus 1 in Epoch AI's directoryepoch.ai
  7. Epoch AI's calculations for this siteGoogle Sheets

Data: Epoch AI, ‘AI data centers’, CC BY 4.0, read Nov 25, 2026. Page: Intelligence Progress, https://intelligenceprogress.com/data-centers/colossus-1