Epoch AI's dated notes on this site, from satellite images, permits and company statements, with the power it estimates at each step. Steps after today are its projection.
No major changes to the data center since February. Solar panels have been placed next to the facility.
340 MW for computing425 MW in all1 building runningWe assume that Anthropic has started using Colossus 1 now, since the announcement said they would get access to 300 MW "within the month" of May.
340 MW for computing425 MW in all1 building runningAnthropic announces their agreement with SpaceX to use all of the compute capacity at Colossus 1. They state that this corresponds to more than 300 MW (presumably IT power) and over 220,000 GPUs. This is slightly different to previous reports adding up to 230,000 GPUs, but still roughly consistent with our estimates.
340 MW for computing425 MW in all1 building runningAll air-cooled chillers have been disconnected and/or removed from the site, leaving only the cooling towers for cooling. The third substation looks complete, with red cables connected to the building.
340 MW for computing425 MW in all1 building runningThird substation was expected to power the building in Fall.
340 MW for computing (was 268 MW)442 MW in all1 building runningThere is still construction visible in the third substation yard and next to the new cooling towers.
268 MW for computing348 MW in all1 building runningThird substation looks completed, but it doesn't appear to be connected to the building yet. Some air-cooled chillers removed, while large cooling towers are added.
268 MW for computing (was 340 MW)348 MW in all1 building running30k B200s added (in GB200 configuration).
340 MW for computing (was 278 MW)442 MW in all1 building runningSecond substation almost connected (red cables)
278 MW for computing361 MW in all1 building running- 139 MW for computing (was 35 MW)181 MW in all1 building running
First significant/useful training workload on 25k H100s.
35 MW for computing45 MW in all1 building runningConstruction starts with a road added on site, retrofitting a former Electrolux building.
No power for computing yet
Power, chips, money and water.
Epoch AI's estimates as of Jun 15, 2026. IT power is what the computers draw; the total adds cooling and the rest of the building.
Costs are Epoch AI's model, about $38 billion per gigawatt of IT power in 2025 dollars, not company figures. Running drawing power now, with no further growth in Epoch AI's projection.
Owners, users and builders.
As Epoch AI records them. The owner is the company that owns the chips, which may not own the building. Who uses a site is often secret, so Epoch says how sure it is.
The chips, counted.
The AI chips at this site by Epoch AI's latest count. Most counts are estimates from the building's power; those marked disclosed come from the company.
| Chip | Designer | How many | Since | How Epoch knows |
|---|---|---|---|---|
| H100 | Nvidia | 150,000 disclosed | Jun 1, 2026 | https://www.anthropic.com/news/higher-limits-spacex. As of June, because they said "within the month [of May]" |
| B200 | Nvidia | 30,000 disclosed | Jun 1, 2026 | https://www.anthropic.com/news/higher-limits-spacex. As of June, because they said "within the month [of May]" |
| H200 | Nvidia | 50,000 disclosed | Jun 1, 2026 | https://www.anthropic.com/news/higher-limits-spacex. As of June, because they said "within the month [of May]" |
Memphis, Tennessee
Address in Epoch AI's records: 3231 Riverport Rd, Memphis, TN 38109.
Also in Tennessee
More of SpaceXAI's
Where the facts come from.
The primary sources Epoch AI lists for this site: permits, filings, company posts and reporting. Epoch's own page and workings are last.
- May 2025 Electricity Provider Disclosuredrive.google.com
- July 2025 Permit for Gas Turbinesscribd.com
- Southern Environmental Law Center Gas Permit Appeal, with additional satellite imagescdn.arstechnica.net
- Disclosure on X (formerly Twitter) by Elon Musk of the breakdown of GPUsarchive.is
- Anthropic announcementanthropic.com
- Colossus 1 in Epoch AI's directoryepoch.ai
- Epoch AI's calculations for this siteGoogle Sheets
Data: Epoch AI, ‘AI data centers’, CC BY 4.0, read Nov 25, 2026. Page: Intelligence Progress, https://intelligenceprogress.com/data-centers/colossus-1