Watched from above.
Epoch AI's dated notes on this site, from satellite images, permits and company statements, with the power it estimates at each step. Steps after today are its projection.
- Epoch AI's projection
Building 3 is estimated to be completed. The site is predicted to have enough power infrastructure installed for a total of 1.5 GW of IT Power. Based on building plans we predict the addition of three more cooling arrays similar to the 6x24 dry coolers near Building 1 and 2. With the completion of current cooling structures and the addition of these arrays there will be ~540MW more cooling capacity for a full facility total of ~1390MW. If this cooling capacity is supplemented by mobile coolers, there would be enough cooling and power infrastructure to support 1.5 GW of IT power.
1.53 GW for computing (was 946 MW)2.06 GW in all3 buildings running The site is estimated to have at least ~830 MW of GPU server power, with at least "at least 220,000 additional GB300 processors and over 400 additional megawatts of compute power", corresponding to the "next phase of expansion" found in the following company S-1 filing, page 76. This estimate is backed up by our cooling and turbine based power production calculations. The cooling calculations suggest there is enough infrastructure to support ~850MW of IT Power. Similarly the energy production calculations support ~900MW of available IT Power. This gives us confidence that the proposed expansion was achieved in time. The roof for building 3 is halfway complete.
946 MW for computing (was 490 MW)1.28 GW in all2 buildings runningThe first array of dry cooling air-cooled condensers for Building 1 has been completed and is operational. A second array, with larger fans, is about halfway complete (located to the south of the first array). More chillers have also been added. For Building 2, an array of dry cooling air-cooled condensers of the same type as Building 1's first array is beginning construction. We believe this corresponds to the "second cluster of 110,000 GB300 processors and 220 megawatts of compute power" from the company S-1 filing, page 76, with compute power corresponding to GPU server power. This is also consistent with our estimates based on cooling equipment.
490 MW for computing (was 239 MW)661 MW in all1 building runningSince October, an array of dry cooling air-cooled condensers has been added (the array of large fans to the left of the building), and appears almost complete. Two more similar arrays appear to be under construction. More air-cooled chillers, batteries, and gas turbines have also been installed.
239 MW for computing323 MW in all1 building runningBattery facility looks complete (though more might be added). Turbines look connected up, minimal construction around them. We believe this state corresponds to the first compute cluster brought online at this site of "approximately 110,000 GB200 processors, approximately 210 megawatts of compute power", as detailed in the company S-1 filing, page 76. Based on those numbers, we believe "compute power" corresponds to GPU server power. Earlier tweets from Elon Musk also support this timing, and it's consistent with the estimated cooling capacity based on the satellite image.
239 MW for computing323 MW in all1 building runningBattery facility connected to the building. 121 air-cooled chillers installed, which could support 200 MW. In the Duke faciltiy in nearby Mississippi, several natural gas turbines are in place but not fully connected up.
No power for computing yetLand clearing begins next to the existing building.
No power for computing yet
Power, chips, money and water.
Epoch AI's estimates as of Jun 15, 2026. IT power is what the computers draw; the total adds cooling and the rest of the building.
Costs are Epoch AI's model, about $38 billion per gigawatt of IT power in 2025 dollars, not company figures. Running and growing drawing power now, and Epoch AI projects more to come.
Owners, users and builders.
As Epoch AI records them. The owner is the company that owns the chips, which may not own the building. Who uses a site is often secret, so Epoch says how sure it is.
No wider project named
Not named
Not named
Not named
The chips, counted.
The AI chips at this site by Epoch AI's latest count. Most counts are estimates from the building's power; those marked disclosed come from the company.
| Chip | Designer | How many | Since | How Epoch knows |
|---|---|---|---|---|
| B300 | Nvidia | 330,000 disclosed | Jun 15, 2026 | Company S-1 filing, page 76 |
| B200 | Nvidia | 110,000 disclosed | Oct 19, 2025 | xAI Memphis announcement |
Memphis, Tennessee
Address in Epoch AI's records: 5420 Tulane Rd, Memphis, TN 38109.
Also in Tennessee
More of SpaceXAI's
Where the facts come from.
The primary sources Epoch AI lists for this site: permits, filings, company posts and reporting. Epoch's own page and workings are last.
- WSJ profile of the Colossus data centerswsj.com
- Final GPU count reported by Elon Muskx.com
- MLGW update mentioning power requests for Colossus 2mlgw.com
- SpaceX-Cursor partnership to use Colossusx.com
- Anthropic to use Colossus 2 from June 2026x.com
- SpaceX S-1 filing, mentioning exact compute and power for Colossus 2sec.gov
- Reflection announces compute agreement with SpaceXAIlnkd.in
- Colossus 2 in Epoch AI's directoryepoch.ai
- Epoch AI's calculations for this siteGoogle Sheets
Data: Epoch AI, ‘AI data centers’, CC BY 4.0, read Nov 25, 2026. Page: Intelligence Progress, https://intelligenceprogress.com/data-centers/colossus-2