Being built · Eagle Mountain, Utah

QTS Eagle Mountain

QTS Eagle Mountain is an AI data center in Eagle Mountain, Utah, owned by Meta (possibly) and used by Meta (possibly). It is being built; Epoch AI projects 304 MW for computing by Jul 2027.

  • 304 MWplanned by Jul 2027
Being built
How it grew

Watched from above.

Epoch AI's dated notes on this site, from satellite images, permits and company statements, with the power it estimates at each step. Steps after today are its projection.

0 MW100 MW200 MW300 MW400 MW2024202520262027Oct 1, 2023: 0 MWDec 31, 2026: 203 MW (projected)Jul 1, 2027: 304 MW (projected)0 MW100 MW200 MW300 MW400 MW2024202520262027Oct 1, 2023: 0 MWDec 31, 2026: 203 MW (projected)Jul 1, 2027: 304 MW (projected)
  1. Epoch AI's projection

    We estimate Building 3 will be fully operational by H2 2027 following a similar time line to Buildings 1 and 2 of 14 months from land clearing to operational.

    304 MW for computing (was 203 MW)411 MW in all3 buildings running
  2. Epoch AI's projection

    We estimate Buildings 1 and 2 will be fully operational by the end of 2026 because there are at least seven months since cooling and emergency generators have started to be installed. This estimate is also in line with similar QTS data center campus construction timelines.

    203 MW for computing274 MW in all2 buildings running
  3. Building 1 roof finished. Satellite imagery shows construction vehicles and concrete pads with no air cooled chiller units indicating Buildings 1 and 2 cooling install continues. On the other side of each building, emergency generator install continues as well.

    No power for computing yet
  4. Site preparation continues. Outline of a first building that is not the data center of interest Buildings 1 or 2 is visible.

    No power for computing yet
  5. First signs of site preparation show up on satellite imagery.

    No power for computing yet
The numbers

Power, chips, money and water.

Epoch AI's estimates as of May 2, 2026. IT power is what the computers draw; the total adds cooling and the rest of the building.

None yetIT power, for the computersMay 2, 2026
None yettotal power, cooling included
304 MWIT power planned by Jul 2027
None yetcomputing power, counted as Nvidia H100 chips
–capital cost so far
$12 billioncapital cost once finished, by Jul 2027
–a year to run (power, staff, upkeep, taxes, water)
No estimateof water use from Epoch AI for this site

Costs are Epoch AI's model, about $38 billion per gigawatt of IT power in 2025 dollars, not company figures. Being built under construction, not yet drawing power for computing.

Who's behind it

Owners, users and builders.

As Epoch AI records them. The owner is the company that owns the chips, which may not own the building. Who uses a site is often secret, so Epoch says how sure it is.

Owns the chips

Meta (possibly)

Uses it

Meta (possibly)

Part of

No wider project named

Investors

Not named

Builders

Not named

Power from

Not named

Sources

Where the facts come from.

The primary sources Epoch AI lists for this site: permits, filings, company posts and reporting. Epoch's own page and workings are last.

  1. QTS Eagle Mountain websiteq.com
  2. DEQ Approval listing emergency generatorsdaqpermitting.utah.gov
  3. QTS Eagle Mountain in Epoch AI's directoryepoch.ai
  4. Epoch AI's calculations for this siteGoogle Sheets

Data: Epoch AI, ‘AI data centers’, CC BY 4.0, read Nov 25, 2026. Page: Intelligence Progress, https://intelligenceprogress.com/data-centers/qts-eagle-mountain