Running · Sedenak Tech Park, Johor, Malaysia

Bridge Data Centres MY06

Bridge Data Centres MY06 is an AI data center in Sedenak Tech Park, Johor, Malaysia, owned by ByteDance (likely) and used by ByteDance (likely). Epoch AI estimates it draws 243 MW for computing.

  • 243 MWfor computing now, #15 of the 96 Epoch AI tracks
  • $9.2 billionbuilt so far, Epoch AI's estimate in 2025 dollars
243 MW now
How it grew

Watched from above.

Epoch AI's dated notes on this site, from satellite images, permits and company statements, with the power it estimates at each step. Steps after today are its projection.

0 MW50 MW100 MW150 MW200 MW250 MW300 MW20222023202420252026Oct 1, 2021: 0 MWDec 31, 2022: 19 MWMay 30, 2023: 61 MWNov 5, 2024: 114 MWMay 25, 2025: 243 MWSep 13, 2026: 243 MW0 MW50 MW100 MW150 MW200 MW250 MW300 MW20222023202420252026Oct 1, 2021: 0 MWDec 31, 2022: 19 MWMay 30, 2023: 61 MWNov 5, 2024: 114 MWMay 25, 2025: 243 MWSep 13, 2026: 243 MW
  1. No visible construction work on Buildings 8-10, but no cars in their carparks either (whereas Building 7 has many cars). So we still don't think Buildings 8-10 are utilized.

    243 MW for computing315 MW in all7 buildings running
  2. All cooling units are now installed on Building 10. Drone footage from the same month shows most cooling units operating for Buildings 5-7, but none (or very few) for Buildings 8-10. So we don't think Buildings 8-10 are operating significantly yet.

    243 MW for computing315 MW in all7 buildings running
  3. Buildings 8 and 9 look structurally complete. The remaining building, building 10, still has construction material around it and scaffolding on the roof, with cooling units yet to be installed.

    243 MW for computing315 MW in all7 buildings running
  4. Buildings 5-7 are operational.

    243 MW for computing (was 114 MW)315 MW in all7 buildings running
  5. Construction looks complete on Building 5, 6 and 7, but we allow 3 more months for fit-out and ramping before declaring them operational.

    114 MW for computing148 MW in all4 buildings running
  6. Building 3 and 4 are operational. Building 3 was originally scheduled for 2024Q4, and seemed partly operational in June, so it's likely to be fully utilized by this date. Building 4 was scheduled for delivery starting 2024Q1, but it typically takes a few more months to fit out and reach full utilization, so we think it's only fully utilized by this date. At Campus 2, Buildings 5-7 and Building 9 are close to finishing construction while Buildings 8 and 10 shells are still under construction. The Campus 2 substation looks complete.

    114 MW for computing (was 61 MW)148 MW in all4 buildings running
  7. Building 2 (MY06-2) is operational.

    61 MW for computing (was 19 MW)79 MW in all2 buildings running
  8. Drone footage indicates that Building 1 is operating at full capacity, with 4 of 5 cooling tower fans spinning. Building 2 has 2 of 21 fans spinning and some ongoing construction work, so we assume it's not fully operational yet. We estimate another 3 months until full utilization.

    19 MW for computing25 MW in all1 building running
  9. Building 1 (MY06-1) is operational. The SEC filing for Chindata and local news sources reported the building was in service as of October 20, but only a subsequent filing confirmed 19 MW was utilized by December 31, so we conservatively assume December 31.

    19 MW for computing25 MW in all1 building running
  10. Land clearing begins for campus 1, seen via satellite imagery. This start date is corroborated by the Malaysian Investment Development Authority, citing November for officially first breaking ground.

    No power for computing yet
The numbers

Power, chips, money and water.

Epoch AI's estimates as of Sep 13, 2026. IT power is what the computers draw; the total adds cooling and the rest of the building.

243 MWIT power, for the computersSep 13, 2026
315 MWtotal power, cooling included
243 MWthe most Epoch AI projects here
221,000computing power, counted as Nvidia H100 chips
$9.2 billioncapital cost so far: $6.3 billion for chips and computers, $2.9 billion for the buildings, power and land
$9.2 billioncapital cost, finished
$0.2 billiona year to run (power, staff, upkeep, taxes, water)
No estimateof water use from Epoch AI for this site

Costs are Epoch AI's model, about $38 billion per gigawatt of IT power in 2025 dollars, not company figures. Running drawing power now, with no further growth in Epoch AI's projection.

Who's behind it

Owners, users and builders.

As Epoch AI records them. The owner is the company that owns the chips, which may not own the building. Who uses a site is often secret, so Epoch says how sure it is.

Owns the chips

ByteDance (likely)

Uses it

ByteDance (likely)

Part of

No wider project named

Investors

Not named

Builders

Not named

Power from

Not named

What's inside

The chips, counted.

The AI chips at this site by Epoch AI's latest count. Most counts are estimates from the building's power; those marked disclosed come from the company.

ChipDesignerHow manySinceHow Epoch knows
B200Nvidia61,573 est.May 25, 2025Adding Buildings 7-10. Chip type based on NVIDIA chip sales in preceding quarter: https://epoch.ai/data/ai-chip-sales?view=graph&tab=count&designerSelect=nvidia&cumulative=false. ByteDance was reported as the anchor tenant for MY06 in 2022 (https://www.mida.gov.my/media-release/bridge-data-centres-and-bytedance-celebrate-grand-opening-of-the-first-phase-hyperscale-data-centre-my06-in-johor-malaysia/).
H100Nvidia44,720 est.Nov 5, 2024Adding Buildings 3 and 4. Chip type based on NVIDIA chip sales in preceding quarter: https://epoch.ai/data/ai-chip-sales?view=graph&tab=count&designerSelect=nvidia&cumulative=false. ByteDance was reported as the anchor tenant for MY06 in 2022 (https://www.mida.gov.my/media-release/bridge-data-centres-and-bytedance-celebrate-grand-opening-of-the-first-phase-hyperscale-data-centre-my06-in-johor-malaysia/).
A100Nvidia65,857 est.May 30, 2023Adding Building 2. Chip type based on NVIDIA chip sales in preceding quarter: https://epoch.ai/data/ai-chip-sales?view=graph&tab=count&designerSelect=nvidia&cumulative=false. ByteDance was reported as the anchor tenant for MY06 in 2022 (https://www.mida.gov.my/media-release/bridge-data-centres-and-bytedance-celebrate-grand-opening-of-the-first-phase-hyperscale-data-centre-my06-in-johor-malaysia/).
Sources

Where the facts come from.

The primary sources Epoch AI lists for this site: permits, filings, company posts and reporting. Epoch's own page and workings are last.

  1. Bridge Data Centers 2025 article about MY06bridgedatacentres.com
  2. Drone footage from 2024youtube.com
  3. Development authority linking Bytedancemida.gov.my
  4. Street view linking second campus MY06-2google.com
  5. Bridge Data Centres MY06 in Epoch AI's directoryepoch.ai
  6. Epoch AI's calculations for this siteGoogle Sheets

Data: Epoch AI, ‘AI data centers’, CC BY 4.0, read Nov 25, 2026. Page: Intelligence Progress, https://intelligenceprogress.com/data-centers/bridge-data-centres-my06