YTL Johor

YTL Johor is an AI data center in Kulai, Johor, Malaysia. Epoch AI estimates it draws 113 MW for computing, rising to 284 MW by Aug 2028.

  • 113 MWfor computing now, #50 of the 96 Epoch AI tracks
  • 284 MWplanned by Aug 2028
  • $4.3 billionbuilt so far, Epoch AI's estimate in 2025 dollars
113 MW now
How it grew

Watched from above.

Epoch AI's dated notes on this site, from satellite images, permits and company statements, with the power it estimates at each step. Steps after today are its projection.

0 MW100 MW200 MW300 MW400 MW20242025202620272028Nov 1, 2023: 0 MWNov 3, 2025: 20 MWMar 14, 2026: 100 MWMay 15, 2026: 113 MWAug 1, 2028: 284 MW (projected)0 MW100 MW200 MW300 MW400 MW20242025202620272028Nov 1, 2023: 0 MWNov 3, 2025: 20 MWMar 14, 2026: 100 MWMay 15, 2026: 113 MWAug 1, 2028: 284 MW (projected)
  1. Epoch AI's projection

    Estimate: all five AI buildings operational. The mean time from first ground activity to operational across buildings 1 and 2 was 25.6 (25.1 and 26.0 months). Buildings 3 and 4 have been underway since Mar 2026, and building 5's plot only has construction equipment as of Jul 2026, so +25 months gives Aug 2028 as campus completion. Company guidance is faster: capacity "expected to double to 600MW by the end of 2027" per Kenanga via The Star; JDC4 phases Sep-25/Sep-26/Sep-27 per MIDF. The resulting ~429MW IT independently matches Kenanga's "expected IT load of 430MW" for the 600MW park (Kenanga, 9 Dec 2024).

    284 MW for computing (was 113 MW)389 MW in all5 buildings running
  2. Satellite imagery confirms Buildings 1 and 2 are structurally complete. Buildings 3 and 4 are underway, and construction equipment can be seen on the plot for Building 5. Extensive solar panel arrays have been built out.

    113 MW for computing155 MW in all2 buildings running
  3. Building 1 added 4 two-fan cooling towers (config 3), installed mid May of 2026. This capacity is not reflected in any disclosure (the building is still reported at 20MW IT load).

    113 MW for computing (was 100 MW)155 MW in all2 buildings running
  4. Building 2 is operational, assuming 3 months to structural completion plus 3 months fit-out after this video. Solar panels are also being installed to the north west of the campus.

    100 MW for computing (was 20 MW)138 MW in all2 buildings running
  5. Building 1 is operational with Nvidia GB200s, according to the local investment development authority.

    20 MW for computing26 MW in all1 building running
  6. Land clearing begins for Building 1.

    No power for computing yet
The numbers

Power, chips, money and water.

Epoch AI's estimates as of Jul 13, 2026. IT power is what the computers draw; the total adds cooling and the rest of the building.

113 MWIT power, for the computersJul 13, 2026
155 MWtotal power, cooling included
284 MWIT power planned by Aug 2028
154,000computing power, counted as Nvidia H100 chips
$4.3 billioncapital cost so far: $3.0 billion for chips and computers, $1.3 billion for the buildings, power and land
$11 billioncapital cost once finished, by Aug 2028
$0.1 billiona year to run (power, staff, upkeep, taxes, water)
No estimateof water use from Epoch AI for this site

Costs are Epoch AI's model, about $38 billion per gigawatt of IT power in 2025 dollars, not company figures. Running and growing drawing power now, and Epoch AI projects more to come.

Who's behind it

Owners, users and builders.

As Epoch AI records them. The owner is the company that owns the chips, which may not own the building. Who uses a site is often secret, so Epoch says how sure it is.

Owns the chips

Not named by Epoch AI

Uses it

Not known

Part of

No wider project named

Investors

Not named

Builders

Not named

Power from

Not named

What's inside

The chips, counted.

The AI chips at this site by Epoch AI's latest count. Most counts are estimates from the building's power; those marked disclosed come from the company.

ChipDesignerHow manySinceHow Epoch knows
B300Nvidia51,192 est.May 15, 2026Building 1 expansion
B200Nvidia9,576 est.Nov 3, 2025Building 1 (JDC2) "fully fitted with the NVIDIA NVL72 Grace Blackwell (GB200) GPUs" at disclosed 20MW IT. https://www.midf.com.my/sites/corporate/files/2025-11/ytl_power-cu-all_systems_go_for_ai_dc-mbsbr-031125.pdf
Sources

Where the facts come from.

The primary sources Epoch AI lists for this site: permits, filings, company posts and reporting. Epoch's own page and workings are last.

  1. Official YTL page for the campusytldatacenters.com
  2. YTL press release on the use of GB200'sytlpowerinternational.com
  3. Aerial footage including the campusyoutube.com
  4. YTL Johor in Epoch AI's directoryepoch.ai
  5. Epoch AI's calculations for this siteGoogle Sheets

Data: Epoch AI, ‘AI data centers’, CC BY 4.0, read Nov 25, 2026. Page: Intelligence Progress, https://intelligenceprogress.com/data-centers/ytl-johor