Being built · Bjerkvik, Narvik, Norway

Microsoft Narvik Norway

Microsoft Narvik Norway is an AI data center in Bjerkvik, Narvik, Norway, owned by Nscale (likely) and used by Microsoft (likely). It is being built; Epoch AI projects 92 MW for computing by Dec 2026.

  • 92 MWplanned by Dec 2026
Being built
How it grew

Watched from above.

Epoch AI's dated notes on this site, from satellite images, permits and company statements, with the power it estimates at each step. Steps after today are its projection.

0 MW20 MW40 MW60 MW80 MW100 MW202420252026Jul 1, 2023: 0 MWDec 31, 2026: 92 MW (projected)0 MW20 MW40 MW60 MW80 MW100 MW202420252026Jul 1, 2023: 0 MWDec 31, 2026: 92 MW (projected)
  1. Epoch AI's projection

    We believe Buildings 1 and 2 will be fully operational by the end of H2 2026

    92 MW for computing124 MW in all2 buildings running
  2. Building 1 cooling looks complete. Backup generator install continues adjacent to B1. Building 2 cooling install continues. Backup generator concrete pads are there, but no equipment install visible. Cooling install appears to continue on Building 3. Construction equipment present all around site. We believe no buildings are operational at this time.

    No power for computing yet
  3. Building 1 cooling looks complete. Backup generator install continues adjacent to B1. Building 2 cooling install continues. Ground prep for generators next to B2. Cooling install appears to continue on Building 3. Construction equipment present all around site. We believe no buildings are operational at this time.

    No power for computing yet
  4. Building 1 starts to go up.

    No power for computing yet
  5. Site prep continues for Buildings 1, 2, and 3.

    No power for computing yet
  6. Land clearing and site prep begins at least as early as July 2023.

    No power for computing yet
The numbers

Power, chips, money and water.

Epoch AI's estimates as of Jul 5, 2026. IT power is what the computers draw; the total adds cooling and the rest of the building.

None yetIT power, for the computersJul 5, 2026
None yettotal power, cooling included
92 MWIT power planned by Dec 2026
None yetcomputing power, counted as Nvidia H100 chips
–capital cost so far
$3.5 billioncapital cost once finished, by Dec 2026
–a year to run (power, staff, upkeep, taxes, water)
No estimateof water use from Epoch AI for this site

Costs are Epoch AI's model, about $38 billion per gigawatt of IT power in 2025 dollars, not company figures. Being built under construction, not yet drawing power for computing.

Who's behind it

Owners, users and builders.

As Epoch AI records them. The owner is the company that owns the chips, which may not own the building. Who uses a site is often secret, so Epoch says how sure it is.

Owns the chips

Nscale (likely)

Uses it

Microsoft (likely)

Part of

No wider project named

Investors

Aker ASA

Builders

Not named

Power from

Not named

Sources

Where the facts come from.

The primary sources Epoch AI lists for this site: permits, filings, company posts and reporting. Epoch's own page and workings are last.

  1. Nscale announcing more than 30.000 Rubin GPUsnscale.com
  2. NScale announcing 230 initial MW and possibly an additional 290MW, mentioning 100.000 Nvidia GPUsnscale.com
  3. Local hydropower facilities will fulfill new demand at 4 to 5 cents per unit for electricitytime.com
  4. Microsoft Narvik Norway in Epoch AI's directoryepoch.ai
  5. Epoch AI's calculations for this siteGoogle Sheets

Data: Epoch AI, ‘AI data centers’, CC BY 4.0, read Nov 25, 2026. Page: Intelligence Progress, https://intelligenceprogress.com/data-centers/microsoft-narvik-norway