Nscale Keflavik

Nscale Keflavik is an AI data center in Reykjanesbær, Iceland, owned by Nscale. Epoch AI estimates it draws 5 MW for computing, rising to 10 MW by Dec 2026.

  • 5 MWfor computing now, #76 of the 96 Epoch AI tracks
  • 10 MWplanned by Dec 2026
  • $0.2 billionbuilt so far, Epoch AI's estimate in 2025 dollars
5 MW now
How it grew

Watched from above.

Epoch AI's dated notes on this site, from satellite images, permits and company statements, with the power it estimates at each step. Steps after today are its projection.

0 MW20 MW2023202420252026Jul 8, 2022: 0 MWApr 23, 2026: 5 MWDec 31, 2026: 10 MW (projected)0 MW20 MW2023202420252026Jul 8, 2022: 0 MWApr 23, 2026: 5 MWDec 31, 2026: 10 MW (projected)
  1. Epoch AI's projection

    Full 15 MW AI deployment projected operational. Nscale and Verne announced a 15 MW deployment across Verne's Iceland campus during 2026. We're modeling the end of the year as the completion date based on this announcement and the progress visible.

    10 MW for computing (was 5 MW)13 MW in all1 building running
  2. Building 1 is operational (estimate). Full campus visibly externally complete from satellite imagery. Virtually no active construction visible.

    5 MW for computing7 MW in all1 building running
  3. 64-rack NVIDIA GB300 NVL72 cluster confirmed in production. Nscale reports that production benchmarking was performed during June across all 64 racks. Month-end is used because the exact benchmark date was not disclosed.

    5 MW for computing7 MW in all1 building running
  4. First Nscale AI capacity operational. Verne reports the first 7.5 MW of Nscale capacity deployed with 128 racks, including 64 liquid-cooled NVIDIA GB300 racks. The AI capacity is assumed to be in the southernmost white building because it is the newest major data hall, has roughly 16 MW of capacity, and was the hall still being expanded most recently before Nscale's deployment; however, Verne and Nscale have not publicly confirmed the building assignment. Digital 9 Reykjanesbær

    5 MW for computing7 MW in all1 building running
  5. Nscale's GPU fit-out begins at the datacenter owned by Verne in Keflavik, Iceland. Estimated from Verne's statement that the first 7.5 MW deployment was completed in approximately three months; the exact start date was not disclosed.

    No power for computing yet
  6. Construction of Building 1 begins. Reykjanesbær planning records from May 11 explicitly state that the next construction phase of KEF301 was under construction by May 2023, so we model it as starting by the beginning of the month as a conservative estimate.

    No power for computing yet
  7. Site preparation begins for the southernmost KEF301 data center, here labeled as Building 1. Heilbrigðiseftirlit Suðurnesja records authorization for Mannverk to demolish the existing structure at Valhallarbraut 872, the parcel later identified as KEF301.

    No power for computing yet
The numbers

Power, chips, money and water.

Epoch AI's estimates as of Jul 27, 2026. IT power is what the computers draw; the total adds cooling and the rest of the building.

5 MWIT power, for the computersJul 27, 2026
7 MWtotal power, cooling included
10 MWIT power planned by Dec 2026
6,000computing power, counted as Nvidia H100 chips
$0.2 billioncapital cost so far: $0.1 billion for chips and computers, $0.1 billion for the buildings, power and land
$0.4 billioncapital cost once finished, by Dec 2026
$0.0 billiona year to run (power, staff, upkeep, taxes, water)
No estimateof water use from Epoch AI for this site

Costs are Epoch AI's model, about $38 billion per gigawatt of IT power in 2025 dollars, not company figures. Running and growing drawing power now, and Epoch AI projects more to come.

Who's behind it

Owners, users and builders.

As Epoch AI records them. The owner is the company that owns the chips, which may not own the building. Who uses a site is often secret, so Epoch says how sure it is.

Owns the chips

Nscale

Uses it

Not known

Part of

No wider project named

Investors

Not named

Builders

Not named

Power from

Not named

What's inside

The chips, counted.

The AI chips at this site by Epoch AI's latest count. Most counts are estimates from the building's power; those marked disclosed come from the company.

ChipDesignerHow manySinceHow Epoch knows
B300Nvidia2,304 est.Apr 23, 20262,304 active B300 GPUs modeled for Phase 1, representing half of the 4,608-GPU installed fleet.
Sources

Where the facts come from.

The primary sources Epoch AI lists for this site: permits, filings, company posts and reporting. Epoch's own page and workings are last.

  1. Nscale / Verne 15 MW deployment announcementnscale.com
  2. Nscale GB300 NVL72 production cluster confirmationnscale.com
  3. Verne Keflavík campus specificationsverne.co
  4. Lenovo Nscale Iceland AI infrastructure case studylenovo.com
  5. Nscale Keflavik in Epoch AI's directoryepoch.ai
  6. Epoch AI's calculations for this siteGoogle Sheets

Data: Epoch AI, ‘AI data centers’, CC BY 4.0, read Nov 25, 2026. Page: Intelligence Progress, https://intelligenceprogress.com/data-centers/nscale-keflavik