Meta Aiken

Meta Aiken is an AI data center in Trenton, South Carolina, owned by Meta and used by Meta. Epoch AI estimates it draws 129 MW for computing.

  • 129 MWfor computing now, #47 of the 96 Epoch AI tracks
  • $4.9 billionbuilt so far, Epoch AI's estimate in 2025 dollars
129 MW now
How it grew

Watched from above.

Epoch AI's dated notes on this site, from satellite images, permits and company statements, with the power it estimates at each step. Steps after today are its projection.

0 MW50 MW100 MW150 MW20252026May 30, 2024: 0 MWAug 7, 2026: 69 MWNov 5, 2026: 129 MW0 MW50 MW100 MW150 MW20252026May 30, 2024: 0 MWAug 7, 2026: 69 MWNov 5, 2026: 129 MW
  1. Building 2 is operational assuming a 3 month lag compared to Building 1.

    129 MW for computing (was 69 MW)168 MW in all2 buildings running
  2. Building 1 is confirmed operational via drone imagery with 8/9 group of coolers with spinning fans. Imagery also confirms all cooling and power infrastructure in place for Building 2.

    69 MW for computing90 MW in all1 building running
  3. Buildings 1 and 2 are nearly complete, but there's still some equipment strewn around the site. We expect around 3 more months needed for commissioning and server installation.

    No power for computing yet
  4. Land clearing begins

    No power for computing yet
The numbers

Power, chips, money and water.

Epoch AI's estimates as of Nov 5, 2026. IT power is what the computers draw; the total adds cooling and the rest of the building.

129 MWIT power, for the computersNov 5, 2026
168 MWtotal power, cooling included
129 MWthe most Epoch AI projects here
147,000computing power, counted as Nvidia H100 chips
$4.9 billioncapital cost so far: $3.4 billion for chips and computers, $1.5 billion for the buildings, power and land
$4.9 billioncapital cost, finished
$0.1 billiona year to run (power, staff, upkeep, taxes, water)
No estimateof water use from Epoch AI for this site

Costs are Epoch AI's model, about $38 billion per gigawatt of IT power in 2025 dollars, not company figures. Running drawing power now, with no further growth in Epoch AI's projection.

Who's behind it

Owners, users and builders.

As Epoch AI records them. The owner is the company that owns the chips, which may not own the building. Who uses a site is often secret, so Epoch says how sure it is.

Owns the chips

Meta

Uses it

Meta

Part of

No wider project named

Investors

Not named

Builders

Not named

Power from

Not named

What's inside

The chips, counted.

The AI chips at this site by Epoch AI's latest count. Most counts are estimates from the building's power; those marked disclosed come from the company.

ChipDesignerHow manySinceHow Epoch knows
B300Nvidia58,271 est.Nov 5, 2026Assumed based on chip ownership data, number calculated from estimated IT power
Sources

Where the facts come from.

The primary sources Epoch AI lists for this site: permits, filings, company posts and reporting. Epoch's own page and workings are last.

  1. Meta Introduction to the Aiken Projectdatacenters.atmeta.com
  2. DPR Construction project pagedpr.com
  3. Meta Aiken in Epoch AI's directoryepoch.ai
  4. Epoch AI's calculations for this siteGoogle Sheets