Epoch AI's dated notes on this site, from satellite images, permits and company statements, with the power it estimates at each step. Steps after today are its projection.
Both buildings still operational according to satellite imagery.
58 MW for computing58 MW in all2 buildings runningBuilding 2 is operational. On February 26, Terawulf stated that CB2A is operational, presumably making up half the final capacity. CB2B was expected in March 2026. However, it's notable that a drone video commissioned from RAAD showed no cooling fan movement on May 8th, suggesting it was not in use. This building is leased to Core42, a subsidiary of UAE-based G42. It likely uses NVIDIA DGX B200 servers.
58 MW for computing (was 16 MW)58 MW in all2 buildings runningBuildings 1 and 2 both appear to have complete building and cooling equipment, based on satellite imagery. Not considering Building 2 operational yet, due to Terawulf's statement that CB2B is expected in March 2026, and is likely still in commissioning phase.
16 MW for computing19 MW in all1 building runningBuilding 1 is operational. Based on Terawulf saying "As of September 30, 2025, the site has energized 245 MW of Bitcoin-mining capacity and 22.5 MW of HPC capacity." The small "Wulf Den" building was said to be 2 MW of IT power while CB-1 would be 16 MW. This is roughly consistent with 22.5 MW of total facility power. This building is leased to Core42, a subsidiary of UAE-based G42. It likely uses NVIDIA DGX B200 servers.
16 MW for computing19 MW in all1 building runningLand clearing begins for Building 1, also known as CB-1, the first large AI/HPC building on the site.
No power for computing yet
Power, chips, money and water.
Epoch AI's estimates as of Jul 23, 2026. IT power is what the computers draw; the total adds cooling and the rest of the building.
Costs are Epoch AI's model, about $38 billion per gigawatt of IT power in 2025 dollars, not company figures. Running drawing power now, with no further growth in Epoch AI's projection.
Owners, users and builders.
As Epoch AI records them. The owner is the company that owns the chips, which may not own the building. Who uses a site is often secret, so Epoch says how sure it is.
The chips, counted.
The AI chips at this site by Epoch AI's latest count. Most counts are estimates from the building's power; those marked disclosed come from the company.
| Chip | Designer | How many | Since | How Epoch knows |
|---|---|---|---|---|
| B200 | Nvidia | 28,463 est. | Mar 31, 2026 | Chip type could be H200, but given the timing and use of liquid cooling, probably B200. TeraWulf press release which references https://www.dell.com/en-us/shop/ipovw/poweredge-xe9680l |
Barker, New York
Address in Epoch AI's records: 7725 Lake Rd, Barker, NY 14012.
Also in New York
Where the facts come from.
The primary sources Epoch AI lists for this site: permits, filings, company posts and reporting. Epoch's own page and workings are last.
- Terawulf press release with details of Core42 lease for Buildings 1-2investors.terawulf.com
- Terawulf press release with details and timeline for Buildings 1-5investors.terawulf.com
- DCD article suggesting that Fluidstack will deploy Google TPUs at Lake Marinerdatacenterdynamics.com
- Announcement of Anthropic-Fluidstack partnership, including data center(s) in New Yorkanthropic.com
- Core42 Lake Mariner in Epoch AI's directoryepoch.ai
- Epoch AI's calculations for this siteGoogle Sheets
Data: Epoch AI, ‘AI data centers’, CC BY 4.0, read Nov 25, 2026. Page: Intelligence Progress, https://intelligenceprogress.com/data-centers/core42-lake-mariner