Intelligence Progress
Running and growing · Barker, New York

Anthropic Lake Mariner

Anthropic Lake Mariner is an AI data center in Barker, New York, owned by AI XPV Platform and used by Anthropic (likely). Epoch AI estimates it draws 210 MW for computing, rising to 378 MW by Mar 2027.

  • 210 MWfor computing now, #24 of the 96 Epoch AI tracks
  • 378 MWplanned by Mar 2027
  • $8.0 billionbuilt so far, Epoch AI's estimate in 2025 dollars
210 MW now
How it grew

Watched from above.

Epoch AI's dated notes on this site, from satellite images, permits and company statements, with the power it estimates at each step. Steps after today are its projection.

0 MW100 MW200 MW300 MW400 MW500 MW20262027Jun 11, 2025: 0 MWMay 31, 2026: 42 MWOct 31, 2026: 210 MWMar 31, 2027: 378 MW (projected)0 MW100 MW200 MW300 MW400 MW500 MW20262027Jun 11, 2025: 0 MWMay 31, 2026: 42 MWOct 31, 2026: 210 MWMar 31, 2027: 378 MW (projected)
  1. Epoch AI's projection

    Building 3 (AKA CB5) is operational. On February 26, 2026, Terawulf stated that CB5 was expected to be energized by Q4 2026. However, based on the pace of Building 2, and comparisons to other projects like Stargate Abilene, we think this is optimistic. We expect a 3-month delay past the end of Q4 2026 to get to full operational capacity.

    378 MW for computing (was 210 MW)441 MW in all3 buildings running
  2. Building 2 (AKA CB4) is operational. On February 26, Terawulf stated that CB4 was expected to be energized by Q3 2026.

    210 MW for computing (was 42 MW)245 MW in all2 buildings running
  3. Building 1 looks complete, consistent with it going operational back in May. Building 2 is mostly complete, with the row of backup generators on the east side of the building still being installed. Building 3 shell is complete, with rooftop coolers midway through installation, and no neighboring generators installed/visible yet.

    42 MW for computing49 MW in all1 building running
  4. Building 1 is operational. On February 26, Terawulf stated that CB3 was expected to be energized by mid-May 2026. A drone video commissioned from RAAD shows several cooling units operating on May 8. It's therefore likely that the building was fully operational around this date.

    42 MW for computing49 MW in all1 building running
  5. Building 1 appears to have a complete shell and cooling equipment. Building 2 shell is still under construction, but 17 cooling units are already loaded on the roof. The outline of Building 3 is visible at the foundation.

    No power for computing yet
  6. Land clearing begins for Building 1 (AKA CB3).

    No power for computing yet
The numbers

Power, chips, money and water.

Epoch AI's estimates as of Oct 31, 2026. IT power is what the computers draw; the total adds cooling and the rest of the building.

210 MWIT power, for the computersOct 31, 2026
245 MWtotal power, cooling included
378 MWIT power planned by Mar 2027
293,000computing power, counted as Nvidia H100 chips
$8.0 billioncapital cost so far: $5.5 billion for chips and computers, $2.5 billion for the buildings, power and land
$14 billioncapital cost once finished, by Mar 2027
$0.2 billiona year to run (power, staff, upkeep, taxes, water)
No estimateof water use from Epoch AI for this site

Costs are Epoch AI's model, about $38 billion per gigawatt of IT power in 2025 dollars, not company figures. Running and growing drawing power now, and Epoch AI projects more to come.

Who's behind it

Owners, users and builders.

As Epoch AI records them. The owner is the company that owns the chips, which may not own the building. Who uses a site is often secret, so Epoch says how sure it is.

Owns the chips

AI XPV Platform

Uses it

Anthropic (likely)

Part of

No wider project named

Investors

Google, Blackstone

Builders

Not named

Power from

Not named

What's inside

The chips, counted.

The AI chips at this site by Epoch AI's latest count. Most counts are estimates from the building's power; those marked disclosed come from the company.

ChipDesignerHow manySinceHow Epoch knows
TPU v7Google125,598 est.Oct 31, 2026Building 2. The building is leased to Fluidstack, and likely contains Google TPUs, which are likely leased to Anthropic. We assume TPU v7 (Ironwood), since v7 is expected to dominate TPU production by mid-2026. Count = IT power / default AI chip IT overhead / TPU v7 TDP.
Where it is

Barker, New York

Address in Epoch AI's records: 7725 Lake Rd, Barker, NY 14012.

Also in New York

Sources

Where the facts come from.

The primary sources Epoch AI lists for this site: permits, filings, company posts and reporting. Epoch's own page and workings are last.

  1. Terawulf press release with details and timeline for Buildings 1-5investors.terawulf.com
  2. DCD article suggesting that Fluidstack will deploy Google TPUs at Lake Marinerdatacenterdynamics.com
  3. Announcement of Anthropic-Fluidstack partnership, including data center(s) in New Yorkanthropic.com
  4. Anthropic Lake Mariner in Epoch AI's directoryepoch.ai
  5. Epoch AI's calculations for this siteGoogle Sheets

Data: Epoch AI, ‘AI data centers’, CC BY 4.0, read Nov 25, 2026. Page: Intelligence Progress, https://intelligenceprogress.com/data-centers/anthropic-lake-mariner